--- title: Carrollton Zoning Ordinance, 6.17.01. Location of [U]tilities in [S]treets collection: local-codes id: local-code:carrollton/zoning/6.17.01 cite_as: Carrollton, Ga., Zoning Ordinance ยง 6.17.01 canonical_url: https://georgiacommons.org/code/local/carrollton/zoning/6.17.01 md_url: https://georgiacommons.org/code/local/carrollton/zoning/6.17.01.md text_url: https://georgiacommons.org/code/local/carrollton/zoning/6.17.01/text source_url: https://library.municode.com/ga/carrollton/codes/code_of_ordinances date: 2025-11-03 status: active jurisdiction: city:carrollton jurisdiction_name: Carrollton place_fips: "1313492" corpus_version: local-codes-carrollton-66c7c129f650 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/carrollton/zoning/~appendix-b/~article-6.md previous: https://georgiacommons.org/code/local/carrollton/zoning/appendix-b-article-6-article-6-21.md next: https://georgiacommons.org/code/local/carrollton/zoning/6.17.02.md index: https://georgiacommons.org/code/local/carrollton.md branch: zoning edition: As published by Municode, current through 2025-11-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carrollton/zoning/6.17.01@2025-11-03-63f89f0c7d --- # Carrollton Zoning Ordinance, 6.17.01. Location of [U]tilities in [S]treets > As published by Municode, current through 2025-11-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS UDO6:29 Supp. No. 7 2. Utilities placed underground shall be placed within the street right-of-way or easement as shown in the Design and Construction Standards. 3. The right-of-way is to be cleared and rough graded the full width prior to any utility installation. 4. Any disturbance or construction in the completed (seeded and/or sodded) right-of-way by a public utility such as power, water, sewer, gas, phone and cable must be repaired and/or replaced with the specified materials as called for in the initial improvements. 5. All utilities beneath pavement shall be installed and the ditch backfilled and thoroughly compacted before any pavement or base is installed, or the pipes shall be bored if installed after street construction. 6. All utility manholes and valve boxes shall be brought to the finished grade within the roadway section. If delay of final topping is approved, manholes and valve boxes shall be installed flush with the binder, and shall be raised to finished grade by the developer when the final topping is installed. 7. All private utilities that will cross under pavement shall be installed completely throughout the subdivision prior to any roadway base being applied. Installation of approved utility sleeves shall be considered as an alternate, or shall be bored if installed after the street has been constructed.