--- title: Carrollton Zoning Ordinance, 7.07.00. STORMWATER CONCEPT PLAN AND CONSULTATION collection: local-codes id: local-code:carrollton/zoning/7.07.00 cite_as: Carrollton, Ga., Zoning Ordinance ยง 7.07.00 canonical_url: https://georgiacommons.org/code/local/carrollton/zoning/7.07.00 md_url: https://georgiacommons.org/code/local/carrollton/zoning/7.07.00.md text_url: https://georgiacommons.org/code/local/carrollton/zoning/7.07.00/text source_url: https://library.municode.com/ga/carrollton/codes/code_of_ordinances date: 2025-11-03 status: active jurisdiction: city:carrollton jurisdiction_name: Carrollton place_fips: "1313492" corpus_version: local-codes-carrollton-66c7c129f650 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/carrollton/zoning/~appendix-b/~article-7.md previous: https://georgiacommons.org/code/local/carrollton/zoning/appendix-b-article-7-7.02.00.md next: https://georgiacommons.org/code/local/carrollton/zoning/7.07.01.md index: https://georgiacommons.org/code/local/carrollton.md branch: zoning edition: As published by Municode, current through 2025-11-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carrollton/zoning/7.07.00@2025-11-03-d8958f7738 --- # Carrollton Zoning Ordinance, 7.07.00. STORMWATER CONCEPT PLAN AND CONSULTATION > As published by Municode, current through 2025-11-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT MEETING Before any stormwater management permit application is submitted, the landowner or developer shall meet with the City Engineer, or his designee, for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting shall take place prior to the submission of any development or redevelopment plan. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project; as well as to discuss and assess constraints, opportunities, and potential ideas for stormwater management designs before the formal site design engineering is commenced.