Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT

7.07.01. Concept Plan Requirements

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

To accomplish this goal, the following information shall be included in the concept plan, which shall be submitted to the City Engineer a minimum of five (5) business days prior to the meeting:

A. Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans that illustrate, at a minimum, existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries of existing predominant vegetation and proposed limits of

clearing and grading; and location of existing and proposed roads, buildings, parking areas, and other impervious surfaces.

B. Natural resources inventory. A written or graphic inventory of the natural resources located within a 1 /4-mile radius of the site as they exist prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site; as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.

C. Post-development stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system, including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties

and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/7.07.01@2025-11-03-e3e91c5287

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 7.07.01. Concept Plan Requirements | Georgia Commons