--- title: Carrollton Zoning Ordinance, 7.13.03. Overbank Flooding Protection collection: local-codes id: local-code:carrollton/zoning/7.13.03 cite_as: Carrollton, Ga., Zoning Ordinance ยง 7.13.03 canonical_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.03 md_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.03.md text_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.03/text source_url: https://library.municode.com/ga/carrollton/codes/code_of_ordinances date: 2025-11-03 status: active jurisdiction: city:carrollton jurisdiction_name: Carrollton place_fips: "1313492" corpus_version: local-codes-carrollton-66c7c129f650 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/carrollton/zoning/~appendix-b/~article-7.md previous: https://georgiacommons.org/code/local/carrollton/zoning/appendix-b-article-7-7.13.02.md next: https://georgiacommons.org/code/local/carrollton/zoning/7.13.04.md index: https://georgiacommons.org/code/local/carrollton.md branch: zoning edition: As published by Municode, current through 2025-11-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carrollton/zoning/7.13.03@2025-11-03-72d8461edd --- # Carrollton Zoning Ordinance, 7.13.03. Overbank Flooding Protection > As published by Municode, current through 2025-11-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24- hour storm under subsection 7.13.02 is waived or modified, then peak discharge rate attenuation of the 2-year through the 25-year return frequency storm event must be provided. The City Engineer may modify or waive the provisions of this subsection for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.