--- title: Carrollton Zoning Ordinance, 7.13.04. Extreme Flooding Protection collection: local-codes id: local-code:carrollton/zoning/7.13.04 cite_as: Carrollton, Ga., Zoning Ordinance ยง 7.13.04 canonical_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.04 md_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.04.md text_url: https://georgiacommons.org/code/local/carrollton/zoning/7.13.04/text source_url: https://library.municode.com/ga/carrollton/codes/code_of_ordinances date: 2025-11-03 status: active jurisdiction: city:carrollton jurisdiction_name: Carrollton place_fips: "1313492" corpus_version: local-codes-carrollton-66c7c129f650 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/carrollton/zoning/~appendix-b/~article-7.md previous: https://georgiacommons.org/code/local/carrollton/zoning/7.13.03.md next: https://georgiacommons.org/code/local/carrollton/zoning/7.13.05.md index: https://georgiacommons.org/code/local/carrollton.md branch: zoning edition: As published by Municode, current through 2025-11-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carrollton/zoning/7.13.04@2025-11-03-191e279442 --- # Carrollton Zoning Ordinance, 7.13.04. Extreme Flooding Protection > As published by Municode, current through 2025-11-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT A. Extreme flood and public safety protection shall be provided by controlling and/or safely conveying the 100-year, 24-hour storm event such that flooding is not exacerbated. B. Extreme flood protection shall be provided either by controlling the 100-year, 24-hour return frequency storm event through on-site or regional structural stormwater controls to maintain the existing 100-year floodplain and/or by sizing the on-site conveyance system to safely pass the 100-year, 24-hour return frequency storm event and allowing it to discharge into a receiving water whose protected floodplain is sufficiently sized to account for extreme flow increases without causing damage. C. The City Engineer may modify or waive the provisions of subsection (A) for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.