A. Periodic inspections of the stormwater management system construction shall be conducted by the City Engineer or conducted and certified by a Professional Engineer (P.E.) licensed in the State of Georgia, a registered landscape architect (RLA), or a registered surveyor who has been approved by the City Engineer. However, the P.E. or RLA who conducts the periodic inspection, if applicable, shall not be the person who certifies the plans pursuant to Section 7.14.02. The purpose of the inspections shall be to establish compliance with the approved stormwater management plan.