4. The City Engineer shall promptly advise the subdivider in writing of the action taken on the submittal. 5. Upon approval of the subdivision construction plans, the developer may apply for a land-disturbing activity permit. 6. Prior to commencing work, the developer must coordinate with the City Engineer concerning the following inspection requirements: a. Erosion control; b. Water/sewer installation (if accomplished by the developer); c. Storm drainage construction; d. Subgrade preparation; e. Curb and gutter installation; f. Base preparation; and g. Asphalt placement. B. Required improvements. Prior to the commencement of construction of any building within a subdivision, the following items must be complete: 1. Storm drainage system including satisfactory stormwater discharge on or off the subdivision site; 2. Street grading; 3. Satisfactory erosion control; 4. All-weather surfacing of roads; 5. Concrete curb and gutters; 6. Bridges necessary to public access along any street proposed for public dedication; 7. Sanitary sewer system including satisfactory on- or off-site disposal of wastewater as per the Design and Construction Standards; 8. Water distribution system with fire hydrants and any off-site extension of the City water supply to the subdivision as per the Design and Construction Standards; 9. All streets, water mains, and sanitary sewer mains are required to be maintained for a period of two (2) years from the date the final plat is approved by the City Engineer; and 10. Approval and filing of the documents of record by the City Engineer.