6.17.00 LOCATION OF UTILITIES AND STREET CUTS 6.17.01 Location of [U]tilities in [S]treets the stormwater detention facilities, and necessary erosion and sedimentation control devices, along with related easements, rights-of-way and slopes. Clearance beyond these limits to balance cut and fill for the streets, drainage or utilities may be approved administratively by the City Engineer based on a grading plan and cut/fill calculations prepared by a Georgia registered professional engineer qualified in site work, provided that the additional clearance is kept to the minimum deemed necessary by the City Engineer.