6.04.00 SURVEY MONUMENTS 6.04.03 Floodplain Elevations street, road or highway begins. If there is any question regarding which side of the highway, road or street any particular utility should use, then said utility shall contact the City Engineer. The City Engineer shall then instruct the public utility regarding which side of a specific road, street or highway the particular utility should use. B. All utilities within existing or proposed City right-of-way shall be installed in accordance with the Design and Construction Standards, and any utility placement guidelines or regulations in effect at the time of installation.