Carrollton · Zoning Ordinance
Appendix B - ZONING (RESERVED) / Article 7 - STORMWATER MANAGEMENT
7.02.00. APPLICABILTY
About this text
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
D. Performance guarantee in accordance with Section 7.10.00, if applicable.
E. Permit application and plan review fees in accordance with Section 7.11.00.
F. Construction drawings, stormwater hydrology, and hydraulics report and site analysis.
Applications for a stormwater management permit that are incomplete or which otherwise do not meet the criteria set forth above, as determined by the City Engineer, shall not be reviewed by the City.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.