A. The removal area shall be completely enclosed with a fence not less than six (6) feet in height where necessary for safety. B. Drainage plans and a plan for the site when the extraction is completed shall be submitted with the application for a development permit. C. Quarrying shall be established only on a site of not less than fifty (50) acres. D. When abutting any other district, a five hundred-foot undisturbed buffer shall be required, unless activity is limited to surface mining as defined by this chapter. When abutting any other district, a one hundred fifty-foot undisturbed buffer shall be required for surface mining.