Skip to content
Georgia Commons
Menu

Cartersville · Zoning Ordinance

Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article VII - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL

Sec. 7.5-188. Education and certification.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Persons involved in land development design, review, permitting, construction, monitoring or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by

the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one (1) person who is in

responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on-site whenever landdisturbing activities are conducted on that site.

A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.

(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on-site may contract with certified persons to meet the requirements of this article.

(d) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A § 12-7-

19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.

History

The history line the source prints at the end of the section.

(Ord. No. 11-10, 5-6-10; Ord. No. 27-16, § 1, 11-17-16)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cartersville/zoning/7.5-188@2026-11-11-bee74623bb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cartersville Zoning Ordinance, Sec. 7.5-188. Education and certification | Georgia Commons