Sec. 7.5-228. Pre-submittal meeting, stormwater concept plan, and stormwater management plan requirements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the City of Cartersville. The pre-submittal meeting should take place based on an early step in the development

process such as before site analysis and inventory (GSMM Section 2.4.2.4) or the stormwater concept plan (GSMM Section 2.4.2.5). The purpose

of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable,

local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the City of Cartersville when applying for a determination of infeasibility through the practicability policy.

(b) The stormwater concept plan shall be prepared using the minimum following steps:

(1) Develop the site layout using better site design techniques, as applicable (GSMM Section 2.3).

(2) Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/ reduction, channel protection, overbank

flooding protection and extreme flood protection (GSMM Section 2.2).

(3) Perform screening and preliminary selection of appropriate best management practices and identification of potential

siting locations (GSMM Section 4.1).

(c) The stormwater concept plan shall contain:

(1) Common address and legal description of the site;

(2) Vicinity map; and

(3) Existing conditions and proposed site layout mapping and plans (recommended scale of one (1) inch equals fifty (50) feet), which illustrate at a minimum:

a. Existing and proposed topography (minimum of two-foot contours);

b. Perennial and intermittent streams;

c. Mapping of predominant soils from USDA soil surveys;

d. Boundaries of existing predominant vegetation and proposed limits of clearing and grading;

e. Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.);

f. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces;

g. Existing and proposed utilities (e.g., water, sewer, gas, electric) and easements;

h. Preliminary estimates of unified stormwater sizing criteria requirements;

i. Preliminary selection and location, size, and limits of disturbance of proposed BMPs;

j. Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains;

k. Flow paths;

l. Location of the boundaries of the base flood floodplain, future-conditions floodplain, and the floodway (as applicable) and relationship of

site to upstream and downstream properties and drainage; and

m. Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings.

(d) The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered professional engineer or a registered landscape architect licensed in the state of Georgia. Items (3), (4), (5), and (6) shall be sealed and signed by a registered professional engineer licensed in the state of Georgia. The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose. (GSMM Section 2.4.2.7)

(1) Natural resources inventory;

(2) Stormwater concept plan;

(3) Existing conditions hydrologic analysis;

(4) Post-development hydrologic analysis;

(5) Stormwater management system;

(6) Downstream analysis;

(7) Erosion and sedimentation control plan;

(8) BMP landscaping plan;

(9) Inspection and maintenance agreement;

(10) Evidence of acquisition of applicable local and non-local permits;

(11) Determination of infeasibility (if applicable);

(12) Performance bonds. The City of Cartersville may require the developer to post an irrevocable letter of credit, or other means

of security acceptable to the city, prior to the issuance of any land disturbance permit for the construction of a development requiring a stormwater management system, or prior to a final plat in certain situations. The amount of the

security shall not be less than the total estimated construction cost of the stormwater management system. The bond required in this section shall include

provisions relative to forfeiture for failure to complete work specified in the approved stormwater management plan, compliance with all of the provisions of this article, other applicable laws and regulations, and any time limitations.

The bond shall not be fully released without a final inspection of the completed work by the City of Cartersville Public Works Department, submission of "asbuilt" plans, a signed maintenance agreement, and a certification of completion by a design engineer that the stormwater

management system complies with the approved plan and provisions of this article.

(e) For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards

the following must also be included in the stormwater management plan for existing stormwater management structures:

(1) As-built drawings;

(2) Hydrology reports;

(3) Current inspection of existing stormwater management structures with deficiencies noted;

(4) BMP landscaping plans.

History

The history line the source prints at the end of the section.

(Ord. No. 28-20, § 1, 11-5-20)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cartersville/zoning/7.5-228@2026-11-11-77566ea21d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cartersville Zoning Ordinance, Sec. 7.5-228. Pre-submittal meeting, stormwater concept plan, and stormwater management plan requirements | Georgia Commons