--- title: Cartersville Zoning Ordinance, Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement collection: local-codes id: local-code:cartersville/zoning/7.5-233 cite_as: Cartersville, Ga., Zoning Ordinance § 7.5-233 canonical_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-233 md_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-233.md text_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-233/text source_url: https://library.municode.com/ga/cartersville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:cartersville jurisdiction_name: Cartersville place_fips: "1313688" corpus_version: local-codes-cartersville-368bd5a9432c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cartersville/zoning/~part-code-of-ordinances/~chapter-7.5/~article-ix.md previous: https://georgiacommons.org/code/local/cartersville/zoning/7.5-232.md next: https://georgiacommons.org/code/local/cartersville/zoning/7.5-234.md index: https://georgiacommons.org/code/local/cartersville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cartersville/zoning/7.5-233@2026-11-11-d9d9f9d23c --- # Cartersville Zoning Ordinance, Sec. 7.5-233. Final inspection; as-built drawings; delivery of inspection and maintenance agreement > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article IX - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT Upon completion of the development, the applicant is responsible for: (a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis; (b) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer; (c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan; and (d) Delivering to the City of Cartersville a signed inspection and maintenance agreeDEVELOPMENT REGULATIONS § 7.5-233 ment that has been recorded by the owner in the property record for all parcel(s) that make up the site. The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Cartersville with the request for a final inspection. The City of Cartersville shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities. ## History (Ord. No. 28-20, § 1, 11-5-20)