--- title: Cartersville Zoning Ordinance, Sec. 7.5-263. Utility permits, written notification, and exempt activities collection: local-codes id: local-code:cartersville/zoning/7.5-263 cite_as: Cartersville, Ga., Zoning Ordinance § 7.5-263 canonical_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-263 md_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-263.md text_url: https://georgiacommons.org/code/local/cartersville/zoning/7.5-263/text source_url: https://library.municode.com/ga/cartersville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:cartersville jurisdiction_name: Cartersville place_fips: "1313688" corpus_version: local-codes-cartersville-368bd5a9432c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cartersville/zoning/~part-code-of-ordinances/~chapter-7.5/~article-xi.md previous: https://georgiacommons.org/code/local/cartersville/zoning/7.5-262.md next: https://georgiacommons.org/code/local/cartersville/zoning/7.5-264.md index: https://georgiacommons.org/code/local/cartersville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cartersville/zoning/7.5-263@2026-11-11-75405a04f3 --- # Cartersville Zoning Ordinance, Sec. 7.5-263. Utility permits, written notification, and exempt activities > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article XI - UTILITY ACCOMMODATIONS (a) Permits; notification. Any work in a city right-of-way shall either require a utility permit, written notification in advance of the work, or shall be exempt, as specified below. Only the utility itself can obtain a permit, and the contractor(s) intended to do the work must be identified on the permit. Work in a city right-of-way without a permit, for any type of work for which a permit is required, shall be a violation of this article. Utility permits provide notice and approval for major projects, new installations, and other similar matters, and should be applied for at least two (2) weeks before the work is scheduled to begin. Written notification provides notice for minor matters and certain repairs. Written notification must be submitted, and acknowledgment of the notice received, prior to any work beginning that requires notification, as specified below. Proceeding on work that requires a written notification, before notification is submitted, or before acknowledgment of the notice is returned, shall be a violation of this article. Exempt activities, as specified below, require neither a utility permit nor written notification. (b) Procedures. The department has written procedures for applying for a utility permit, and for providing written notification. Such procedures are incorporated herein by reference, and are available from the department, along with necessary forms. The department may require such information as it deems necessary prior to issuance of a utility permit. (c) Utility permits. Utility permits shall be required in the following situations: (1) Installation of new utilities, for new commercial, residential or industrial developments, projects or subdivisions. (2) Work involving underground burial of utilities and overhead work, unless specifically covered under written notification procedures or exempted below. (3) Any new utility pole installation; replacements are covered by written notification, and emergency replacements are exempt (see emergency repair regulations). (4) Utility tie-ins that require cutting any roadway more than half of the width. (5) Linear projects involving multiple service connections or roadway crossings that are not perpendicular. (d) Written notification. Written notification must be submitted, and acknowledgment of the notice received back from the department, prior to any work beginning that requires written notification, as specified below. If a situation arguably falls under both the written notification and the utility permit procedures, the utility permit procedures shall be used, unless otherwise determined by the department. Written notification shall be required in the following situations: (1) Maintenance, inspection, and/or testing of utilities (including replacement of parts necessary due to damage, deterioration or obsolescence) that would: a. Require blocking of more than one (1) travel lane; b. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or c. Require cutting, trenching or boring in or under the roadbed. (2) Installation of lateral service connections to serve occupants of adjacent property, if such connections: a. Introduce any new obstructions onto the right-of-way; b. Require blocking of more than one (1) travel lane; c. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or d. Require cutting, trenching or boring in or under the roadbed. (3) Installation of additional appurtenances or attachments to facilities which: a. Affect vertical or horizontal clearances from the traveled way; b. Change the rated capacity or transmittance of the facility for which a permit was issued; c. Require blocking of more than one (1) travel lane; d. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or e. Require cutting, trenching or boring in or under the roadbed. (4) Any work which requires the blocking of more than one (1) traffic lane for any length of time, or requires blocking one (1) traffic lane for more than two (2) hours in a 24-hour period. (5) Any digging in the roadbed with mechanical excavating equipment (i.e., excavating equipment powered by hydraulics, engines or other motors) shall require written notification unless already covered by a utility permit. (6) Installation of any temporary structures that are to remain in the right-of-way longer than twenty-four (24) hours. (7) Cutting, trimming or spraying of any trees or shrubs, or other vegetation control, within the right-of-way. (8) Any work involving making any pavement cuts, unless specifically exempted below. (9) Utility tie-ins that consist of not cutting any roadway more than half of the width of the roadway. (10) Boring, punching and directional drilling for service tie-in that is not a linear project and instead results in a perpendicular crossing of the roadway (an eight (8) by eleven (11) inch sketch drawing of any boring, punch or directional drilling to ascertain its location will be required); linear projects or crossings that are not perpendicular require utility permits. (e) Exempt activities. The following activities shall not require a utility permit or written notification, provided they do not also include any activity specifically listed as requiring a utility permit or written notification: (1) Routine or periodic maintenance, inspection, and/or testing of utilities (including replacement of parts necessary due to damage, deterioration or obsolescence) that would not: a. Require blocking of more than one (1) travel lane; b. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or c. Require cutting, trenching or boring in or under the roadbed. (2) Installation of lateral service connections to serve occupants of adjacent property, if such connections do not: a. Introduce any new obstructions onto the right-of-way; b. Require blocking of more than one (1) travel lane; c. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or d. Require cutting, trenching or boring in or under the roadbed. (3) Installation of additional appurtenances or attachments to facilities that would not: a. Affect vertical or horizontal clearances from the traveled way; b. Change the rated capacity or transmittance of the facility for which a permit was issued; c. Require blocking of more than one (1) travel lane; d. Require the blocking of one (1) travel lane for a period of longer than two (2) hours in a 24-hour period; or e. Require cutting, trenching or boring in or under the roadbed. (4) Potholing for utility locates, meaning excavating holes no larger than twentyfour (24) inches square, which must be filled in at the end of each workday. (5) Utility damage repairs created from construction or routine maintenance performed by the city public works department. (6) Utility work being performed in a new development within the construction limits of the new development prior to the development's roads, rights-of-way and easements being deeded to the community development department. (7) Emergency repairs. See subsection (f) below for applicable requirements for circumstances requiring post-repair notification. (f) Emergency repairs. Emergency repairs do not require the giving of written notification before the repair is conducted, but repairs that would otherwise require written notification (i.e., would not be exempt repairs anyway) must provide post-repair written notification as soon as possible, no later than the end of the next business day. The sole exception is repairs that would only require notification due to blockage of a lane for more than two (2) hours, or blockage of more than one (1) lane; post-repair notification is not required for such repairs. However, postrepair notification is required for: repairs that require mechanical excavation; repairs that require boring, cutting or trenching the roadway; repairs that affect vertical clearances; repairs that install replacement poles; and so forth. An emergency repair is defined as an emergency replacement of poles, wires, or other facilities damaged by accidents or natural causes such as wind or ice and when immediate repair is required to repair service, or in cases where there is an imminent threat to public health or safety. In the event of an emergency repair requiring the blockage of one (1) or more travel lanes, E-911 should be notified as soon as possible by telephone. ## History (Ord. No. 37-19, § 1, 9-19-19)