In conjunction with the development standards in Table 2-4, additional standards apply, as follows: A. The Board of Health may require larger minimum lot sizes when lots are served by septic systems. B. Uses requiring a special use permit must comply with any more stringent setback lines provided for in Article IX of this UDC. C. Front yard setbacks are measured from the right-of-way. D. The minimum front yard setback at a major street is 40 feet, with the exception of the PCFD and PUD zoning districts. E. The front yard setback at major traffic corridors is a minimum of 100 feet from centerline (major traffic corridors are roadways with GDOT traffic counts above 2,000 per day - both directions), with the exception of the PCFD and PUD zoning districts. F. The rear yard setback may be decreased to 20 feet at corner lots in R-1 and R-3 zones. G. In situations requiring buffers, the buffer requirements shall take precedence over any setback requirements contained in Table 2-4, to the extent the buffer requirements exceed or are greater than the setback requirements. H. Buildings or structures which are intended for use or used for the housing or shelter of livestock, silos, granaries, windmills, barns and similar structures which are concurrent to the operation of an agricultural enterprise shall observe a minimum setback of 50 feet from any property line and be spaced a minimum of 200 feet from any residence on an adjacent lot or parcel. (I) Buildings or structures intended for residential use shall have a minimum of 700 square feet of finished and conditioned space.