Skip to content
Georgia Commons
Menu

Catoosa County · Zoning Ordinance

Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article III - NATURAL RESOURCE PROTECTION

3.04.03. Protection Criteria

About this text

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

No regulated activity will be permitted within the Wetlands Protection District without written permission or a permit from the county.

A. If the area proposed for development is located within 50 feet of a wetlands protection district boundary, as determined by the Stormwater Management Director using the Generalized Wetlands Map, a U.S. Army Corps of Engineers (<Corps<) determination shall be required.

B. If the Corps determines that wetlands are present on the proposed development site, the local permit or permission will not be granted until a Section 404 Permit or letter of permission is issued.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:catoosa-county/zoning/3.04.03@2023-09-19-7f564c8bb8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Catoosa County Zoning Ordinance, 3.04.03. Protection Criteria | Georgia Commons