Catoosa County · Zoning Ordinance

Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article III - NATURAL RESOURCE PROTECTION

3.06.08. Monitoring of Discharges

About this text

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Applicability. This subsection applies to all facilities which produce storm water discharges associated with industrial activity, including construction activity.

B. Access to Facilities.

1) The authorized enforcement agency shall be permitted to enter and inspect facilities subject to regulation under this Section as often as may be necessary to determine compliance with this Section. If a discharger has security measures in force which require proper identification and clearance before entry into its premises, the discharger shall make the necessary arrangements to allow access to representatives of the authorized enforcement agency.

2) Facility operators shall allow the authorized enforcement agency ready access to all parts of the premises for the purposes of inspection, sampling, examination and copying of records that must be kept under the conditions of an NPDES permit to discharge stormwater, and the performance of any additional duties as defined by state and federal law.

3) The authorized enforcement agency shall have the right to set up on any permitted facility such devices as are necessary, in the opinion of the authorized enforcement agency, to conduct monitoring and/or sampling of the facility's stormwater discharge.

4) The authorized enforcement agency has the right to require the discharger to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality shall be calibrated to ensure their accuracy.

5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the operator at the written or oral request of the authorized enforcement agency and shall not be replaced. The costs of clearing such access shall be borne by the operator.

6) Unreasonable delays in allowing the authorized enforcement agency access to a permitted facility is a violation of a stormwater discharge permit and of this Section. A person who is the operator of a facility with a NPDES permit to discharge stormwater associated with industrial activity commits an offense in violation of this Section if the person denies the authorized enforcement agency reasonable access to the permitted facility for the purpose of conducting any activity authorized or required by this Section.

7) If the authorized enforcement agency has been refused access to any part of the premises from which stormwater is discharged, and an agent of the authorized enforcement agency is able to demonstrate probable cause to believe that there may be a violation of this Section, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this Section or any order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the authorized enforcement agency may seek issuance of a search warrant from any court of competent jurisdiction.

3.06.09 Requirement to Prevent, Control, and Reduce Stormwater Pollutants by the Use of Best Management Practices

A. The authorized enforcement agency shall adopt and publish requirements and regulations identifying best management practices (BMPs) for any activity, operation, or facility which may cause or contribute to pollution or contamination of storm water, the storm drain system, or waters of the U.S.

B. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the municipal storm drain system or watercourses through the use of these structural and non-structural BMPs. Further, any person responsible for a property or premise, which is, or may be, the source of an illicit discharge, may be required to implement, at said person's expense, additional structural and non-structural BMPs to prevent the further discharge of pollutants to the municipal separate storm sewer system. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of stormwater associated with industrial activity, to the extent practicable, shall be deemed compliance with the provisions of this Section. These BMPs shall be part of a stormwater pollution prevention plan (SWPP) as necessary for compliance with requirements of the NPDES permit.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:catoosa-county/zoning/3.06.08@2023-09-19-bc19a7b61b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Catoosa County Zoning Ordinance, 3.06.08. Monitoring of Discharges | Georgia Commons