Skip to content
Georgia Commons
Menu

Catoosa County · Zoning Ordinance

Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article III - NATURAL RESOURCE PROTECTION

3.07.01. General Provisions

About this text

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Purpose and Intent. The purpose of this Section is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased postdevelopment stormwater runoff and non-point source pollution associated with new development and redevelopment. It has been determined that proper management of

post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. This Section seeks to meet that purpose through the following objectives:

1) Establishing decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources;

2) Requiring that new development and re-development maintain the predevelopment hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, non-point source pollution and

increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;

3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;

4) Establishing design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards;

5) Encouraging the use of non-structural stormwater management and better stormwater site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable;

6) Coordinating site design plans, which include greenspace, with the county's greenspace protection plan;

7) Establishing provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and

8) Establishing administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:catoosa-county/zoning/3.07.01@2023-09-19-209062217d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Catoosa County Zoning Ordinance, 3.07.01. General Provisions | Georgia Commons