4.08.02. Buffers, Where Required

About this text

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. An adequate buffer strip of at least 50 feet in width shall be required and maintained between single-family conventional residential property in any zone and any area zoned other than R-1, R-2, R-3, RTZ, A-1, or C-R. Such buffer shall be constructed and/or maintained by the owner of the land zoned other than R-1, R-2, R-3, RTZ, A-1, or C-R, unless the conditions described in subsection E below are present.

B. An adequate buffer strip at least 50 feet in width shall be required and maintained between any manufactured home and any single-family, two-family, tri-plex, quadplex or multi-family residential housing or zoning district. Evergreen or opaque screening will usually be required between any manufactured home and any nonmanufactured home dwellings or zoning districts. Sufficient screening may be provided by natural vegetation that provides a substantially opaque natural screen, or the topography or other conditions existing at the site may provide a substantially opaque screen.

C. A buffer strip of at least 50 feet in width shall be required and maintained between any area zoned commercial, (C-1, C-2 or C-3), and any residential property in any zone. Such buffer shall be constructed and/or maintained by the owner of the land zoned as commercial, unless the conditions described in subsection E. below are present.

D. A buffer strip of at least 100 feet in width shall be required and maintained between any area zoned industrial (I-1 or I-2), and any other zone. Such buffer shall be constructed and/or maintained by the owner of the land zoned as industrial, unless the conditions described in subsection E. below are present.

E. When a proposed development adjoins an existing development of a higher intensity, but the full width of the required buffer does not exist on the existing development, the new development shall provide a buffer of adequate width to meet the full width requirements as presented in this Section when considered in combination with any existing buffer on the property of the adjoining existing development.

History

The history line the source prints at the end of the section.

(Ord. of 6-22-21(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:catoosa-county/zoning/4.08.02@2023-09-19-78285c4e8a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Catoosa County Zoning Ordinance, 4.08.02. Buffers, Where Required | Georgia Commons