Skip to content
Georgia Commons
Menu

Catoosa County · Zoning Ordinance

Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article V - ACCESSORY AND TEMPORARY USES

5.04.04. Special Use Permit Required

About this text

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following actions shall require a special use permit in accordance with the requirements of this Section and Article IX of this UDC:

A. The placement or construction of any new wireless support structure.

B. The collocation or modification to a previously approved wireless facility that proposes:

1) An increase the overall height or width of the wireless support structure to which the wireless facilities are to be attached;

2) An increase in the dimensions of the equipment compound initially approved by Catoosa County;

3) To exceed the applicable weight limits for the wireless support structure, as demonstrated by a letter from a structural engineer licensed to practice in this state.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:catoosa-county/zoning/5.04.04@2023-09-19-3c072ba3a4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Catoosa County Zoning Ordinance, 5.04.04. Special Use Permit Required | Georgia Commons