--- title: Catoosa County Zoning Ordinance, 6.02.01. Quality Assurance collection: local-codes id: local-code:catoosa-county/zoning/6.02.01 cite_as: Catoosa County, Ga., Zoning Ordinance ยง 6.02.01 canonical_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.01 md_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.01.md text_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.01/text source_url: https://library.municode.com/ga/catoosa_county/codes/code_of_ordinances date: 2023-09-19 status: active jurisdiction: county:catoosa jurisdiction_name: Catoosa County county_fips: "13047" corpus_version: local-codes-catoosa-county-2d79ba3b5467 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/catoosa-county/zoning/~appendix-a/~article-vi.md previous: https://georgiacommons.org/code/local/catoosa-county/zoning/6.01.03.md next: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.02.md index: https://georgiacommons.org/code/local/catoosa-county.md branch: zoning edition: As published by Municode, current through 2023-09-19 edition_date_kind: current_through source_publisher: Municode version_id: local-code:catoosa-county/zoning/6.02.01@2023-09-19-654cf486e8 --- # Catoosa County Zoning Ordinance, 6.02.01. Quality Assurance > As published by Municode, current through 2023-09-19 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article VI - INFRASTRUCTURE IMPROVEMENTS Quality assurance during construction will be required. A. All quality control testing which is a part of roadway construction will be performed by a reputable professional geo-technical and testing engineering company that will be employed by the developer and all associated costs will be paid by the developer. B. The developer shall select a Geotechnical Engineering firm from the current Georgia Department of Transportation (GDOT) list of qualified professionals, or a firm acceptable to Catoosa County, and notify the Public Works Department of that selection. The following requirements shall apply: 1) The geotechnical firm shall contract directly with the developer to provide quality assurance on the project. 2) The developer shall be responsible for scheduling the geotechnical firm. 3) Minimum testing requirements are described in this Article. 4) Location and scheduling of testing shall be coordinated with the County's representative for assurance of reasonable conformance with the requirements described in this Article prior to performing tests to avoid the expense of retesting. 5) Testing milestones shall be established during the Preconstruction Conference required in Article IX. 6) A final report shall be required in accordance with Section 6.02.02C of this UDC.