--- title: Catoosa County Zoning Ordinance, 6.02.02. Submittal and Procedural Requirements collection: local-codes id: local-code:catoosa-county/zoning/6.02.02 cite_as: Catoosa County, Ga., Zoning Ordinance ยง 6.02.02 canonical_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.02 md_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.02.md text_url: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.02/text source_url: https://library.municode.com/ga/catoosa_county/codes/code_of_ordinances date: 2023-09-19 status: active jurisdiction: county:catoosa jurisdiction_name: Catoosa County county_fips: "13047" corpus_version: local-codes-catoosa-county-2d79ba3b5467 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/catoosa-county/zoning/~appendix-a/~article-vi.md previous: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.01.md next: https://georgiacommons.org/code/local/catoosa-county/zoning/6.02.03.md index: https://georgiacommons.org/code/local/catoosa-county.md branch: zoning edition: As published by Municode, current through 2023-09-19 edition_date_kind: current_through source_publisher: Municode version_id: local-code:catoosa-county/zoning/6.02.02@2023-09-19-2039284358 --- # Catoosa County Zoning Ordinance, 6.02.02. Submittal and Procedural Requirements > As published by Municode, current through 2023-09-19 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article VI - INFRASTRUCTURE IMPROVEMENTS A. The developer shall submit a pavement design prepared by a Georgia licensed professional engineer for approval of the Director of Public Works. For subdivisions that will be constructed in stages, the pavement design shall be based on the number of lots from all stages and on a field evaluation of the subgrade soils conducted by a geotechnical engineer. B. The Geotechnical Engineer shall complete a field evaluation of the roadway before any roadway construction begins. 1) The Geotechnical Engineer shall conduct a field exploration of the soils along the roadway alignment at a spacing of no greater than 500 feet and obtain samples of the subgrade soils for laboratory evaluation. 2) A composite soil sample of each soil type shall be obtained and tested for plasticity (Atterberg limits, ASTM D4318) and standard Proctor moisturedensity relationship (ASTM D698). 3) California Bearing Ratio (ASTM D1883) tests shall be conducted on a composite sample representative of the soil conditions, as determined by the Geotechnical Engineer. 4) The California Bearing Ratio (CBR) test shall be conducted on soaked samples. 5) CBRs less than 6 require base, and pavement thickness to be determined by Geotechnical Engineer evaluation. C. A final report by the geotechnical engineer that the quality assurance tests and inspections have been performed and the construction has been completed in substantial compliance with Catoosa County design and construction standards, specifications, and applicable portions of subdivision regulations will be required before the plat is recorded. 1) The final report shall be compiled in accordance with all applicable ASTM standards for geotechnical reporting. 2) One copy of the final report shall be given to Catoosa County. D. Preliminary or final plat approval by the Planning Commission does not constitute permission to begin any street or utility construction. 1) Street and utility construction plans may be approved as a whole or in part. 2) Construction of approved portions of the work shall not precede issuance of applicable Land Disturbing Activity Permits. E. Public streets to be accepted by the County will be at the discretion of the Board of Commissioners. Acceptance will be considered only upon separate written request by the developer, subdivider, or any person or persons who own all fee simple interest in the subject street. F. See Article IX for final plat approval requirements. G. See Section 6.02.04 for requirements pertaining to official acceptance of improvements.