6.03.10. Development Entrance, Residential
About this text
- As published by Municode, current through 2023-09-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Access to every subdivision shall be provided over a public street. Existing subdivisions with private streets can be continued without additional access to a public street, subject to subsection B. below.
B. All subdivisions resulting in the creation of 150 or more lots shall be provided with a minimum of two entrances. Where the property configuration prohibits or makes impractical the installation of two public access entrances, an alternative access may be approved or this provision may be waived by the Director of Public Works for existing zoned property only. All property applying for rezoning that have less than the required number of entrances must receive approval from the Board of Commissioners.
C. In the event an alternative second entrance is required, said entrance must be at least 20 feet wide with a 20-foot wide access easement and be constructed of all-weather surface. All alternative secondary access entrances and construction materials must be pre-approved by the Director of Public Works and the Building Official.
D. All proposed subdivision developments (residential, nonresidential, and nonresidential single lot developments) where a new entrance is provided from an existing county road, shall construct deceleration lanes subject to the following requirements, and Standard Detail 206 cSubdivision Entrance Intersection.c
E. Any residential subdivision accessed by a county road shall conform to Standard Detail 206 cSubdivision Entrance Intersection.c
F. All nonresidential subdivisions will install a full deceleration lane, offset radii and tapers.
G. Access onto a state road shall meet existing GDOT requirements. Before the plans can be approved, a copy of the GDOT permit or GDOT Letter of Intent shall be submitted to the Director of Public Works stating that a curb cut will be granted as long as the applicant meets all GDOT standards. The submitted construction plans must indicate by a note on the preliminary plat that the plans have been approved subject to all modifications or requirements placed upon the development by the
GDOT.
H. Deceleration lane and taper length shall be based on the main roadway posted speed limit as follows. The Director of Public Works may require residential subdivisions exceeding 200 or at his discretion below 200 lots to install longer deceleration lanes and/or a center turn lane. If the Director of Public Works determines that the entrance onto a county roadway could result in a safety problem then the County may require the Developer to present a traffic study to address any safety concerns.
Table 6-4 Deceleration Lane and Taper Width Main Road Speed Limit Deceleration Lane Length (feet) Transition Taper Length (feet) 55 mph 200 50 50 mph 150 40 45 mph 110 35 40 mph 90 30 35 mph or less 50 25
I. The minimum pavement width of a deceleration lane shall be 12 feet, and the minimum turning radius shall conform with Standard Detail 206. The minimum pavement design for the proposed street shall be 6 inches/2 inches/1� inches or match the existing pavement specification, whichever is greater.
J. Additional street right-of-way necessary for deceleration lanes shall be dedicated as needed, and as illustrated in Standard Detail 206 "Subdivision Entrance Intersection."
K. The cross slope of any deceleration lane shall follow the crown or super elevation of the existing street.
L. In cases involving rock cuts, deep fills or cuts, proximity to a floodplain, or other constraints to construction, the requirements for pavement widening for a full deceleration lane may be waived by the Director of Public Works.
M. Vertical faced curb and gutter or concrete extruded curbs are required through the radius, excluding the tapers.
N. The developer shall be responsible for the costs of any utility relocation or catch basins that must be constructed. See also Section 6.03.17.