A. A special use permit shall be required for the construction of a new tower in any zoning district. All such uses shall comply with requirements set forth in this article and all other applicable codes and ordinances, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means, including planned or potential locations which would provide the same or similar coverage or capacity. B. In granting a special use permit, the city may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties. 11.5.2 Application; Contents; Fee. All applications for special use permits shall be submitted to the City of Cave Spring's City Clerk. An application for a special use permit shall not be accepted for processing without the information and application fee required by this ordinance. 11.5.3 Independent Expert Review. The city may engage a licensed professional engineer as an independent expert to review any of the materials submitted by an applicant for a special use permit and render an opinion regarding any concerns about the proposal, including, but not limited to, structural integrity and the feasibility of alternative sites or co-location. Following the review of an independent expert, the city shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. If the applicant is unable to satisfactorily address those concerns, the applicant shall be allowed a reasonable amount of time, not to exceed 30 days, following the receipt of the letter in which to modify the application to alleviate the city's concerns or withdraw the application altogether. The expert's opinion shall be considered determinative, unless the applicant agrees to pay the expenses of submitting both opinions for a peer review, which review shall then be considered final. If the independent third-party expert supports the applicant's expert, then the department shall pay the expenses of said third-party expert. If the independent third-party expert supports the position of the department, then the applicant shall pay the expenses of said third-party expert. 11.5.4 Public Hearing. Before taking action upon the proposed special use permit, the city shall hold a public hearing on the matter consistent with the procedures of this ordinance pertaining to special use permits. 11.5.5 Considerations in Approval or Denial of Special Use Permits. Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The following factors may be taken into consideration in acting upon a special use permit application under the provisions of this article: A. The height and setbacks of the proposed tower or antenna(s); B. The proximity of the tower or antenna(s) to residential structures and residential district boundaries; C. The nature of uses on adjacent and nearby properties; D. The surrounding topography; E. The surrounding tree coverage and foliage; F. The design of the tower or antenna(s), with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; G. The proposed ingress and egress; H. The availability of suitable existing towers or other structures for antenna co-location; I. The impact of the proposed tower or antenna(s) upon scenic views and visual quality of the surrounding area; J. The needs of the applicant as balanced against the detrimental effects on surrounding properties; and K. The impact of the proposed tower or antenna(s) on adjacent and nearby properties. 11.5.6 Resubmittal of Special Use Application. An application for a special use permit which has been denied shall not be resubmitted for a period of 12 months. 11.5.7 Time. All collocation applications shall be ruled upon within 90 days of the filing of a completed application; all other applications shall be ruled upon within 150 days of a completed application. Applications which are not completed at the time of filing shall not be accepted, and city staff shall review the application to verify completeness within 30 days from the filing of the application. In the event that an application is determined to not be complete within the initial 30-day period after filing, city staff shall promptly notify the applicant, and the time for issuance of the decision shall be tolled for the time period between such notification to the applicant and the date the applicant files materials which complete the application. The time periods within this subparagraph may be extended by the mutual consent of the city and the applicant.