Cedartown · Zoning Ordinance
Chapter 94 - ZONING / Article IX - STANDARDS FOR TELECOMMUNICATIONS ANTENNAS AND TOWERS
Sec. 94-641. Application procedures.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) General application requirements for all building and special use permits. Application for a building permit or special use permit for any telecommunications facility shall be made to the building inspector by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The following information shall be submitted for an application to be considered complete when applying for any building permit, special use permit or other permit or variance included in this article:
(1) Basic information.
a. Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses.
b. Landscape plan to scale indicating size, spacing and type of plantings required in sections 94-141 and 94-142.
c. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, or streetscapes.
d. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such maintenance.
e. Detailed construction plans and/or drawings, and a report from a qualified, independent engineer licensed in the State of Georgia, documenting the following:
1. Telecommunications facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design;
2. Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated;
3. Evidence of structural integrity of the tower structure; and
4. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris.
f. A definition of the area of service to be served by the antenna or tower and whether such antenna or tower is needed for coverage or capacity.
g. Information showing the proposed facility would provide the needed coverage or capacity.
h. If applicant is a firm, corporation, or business entity, the identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number and electronic mail address, if applicable.
i. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network, or description of describe the distance between the telecommunications facility sites, and a description of how this service area fits into and is necessary for the service network.
j. Designation of which location preference, identified in section 94-639 above, the proposed facility is meeting. If the proposed location is not a preferred location or is a disfavored site, describe:
1. What publicly-used building, colocation site or other preferred location sites are located within the geographic service area. Provide a list (by address with map and parcel number noted) and a map at 1:200 scale of all such buildings within the service area;
2. What good faith efforts and measures were taken to secure each of these preferred location sites;
3. Why each such site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and
4. How and why the proposed site is essential to meet service demands for the geographic service area and citywide network.
(2) Five-year plan and site inventory. Each application shall include a five-year facilities plan and site inventory including the following:
a. A list of all telecommunications facility sites, whether such sites are existing, existing to be upgraded or replaced, or merely proposed, within the city limits and within one mile of the city limits and a map showing these sites. The list must include the following information for each site:
1. Street address;
2. Assessor's map and parcel or other applicable ad valorem tax identification number;
3. Zoning district;
4. Type of building (commercial, residential, mixed use) and number of stories;
5. The number of antennas and base transceiver stations per site and the location and type of antenna installation (stand-alone rooftop, building facade, etc.) and location of the base transceiver station installation(s);
6. The height from grade to the top of the antenna installation; and
7. The radio frequency range in megahertz, the wattage output of the equipment and effective radiated power.
b. If the applicant does not know specific future tower and antenna site locations but does know of areas where telecommunications facilities may be needed within the next five years to provide service, the applicant shall list the assessor's map and parcel numbers contained within the anticipated geographic service area and identify each geographic service area with a number that will correspond to the future telecommunication facility site.
(3) Additional information requirements for towers.
a. If the proposed site is zoned residential or C-1, C-2, or C-N, and there are alternative sites in IND-L or IND-G, applicants must justify why those alternate sites have not been proposed. The building inspector will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The building inspector shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
b. Applicants must identify all existing towers and all towers for which there are applications currently on file with the building inspector. Applicants must provide evidence of the lack of space on all suitable existing towers to locate the proposed antenna and of the lack of space on existing tower sites to construct a tower for the proposed antenna. If colocation on any such towers would result in less visual impact than the visual impact of the proposed tower, applicants must justify why such colocation is not being proposed. If colocation on any such tower would increase negative visual impact, then the applicant must so state and demonstrate. The building inspector will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The building inspector shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
c. In all zones, applicants must demonstrate that they cannot provide personal wireless communication service without the use of a telecommunications tower.
d. The applicant shall quantify the additional tower capacity anticipated, including the approximate number and types of antennas. The applicant shall provide a drawing for each tower showing existing and proposed antennas locations. The applicant shall also describe any limitations on the ability of the tower to accommodate other uses, e.g., radio frequency interference, mass height, frequency or other characteristics. The applicant shall describe the technical options available to overcome those limitations and reasons why the technical options considered were not chosen to be incorporated. The building inspector shall approve those limitations if they cannot be overcome by reasonable technical means.
e. The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power lines impacting the proposed tower site.
(4) Other information requested by building inspector. The applicant must provide any other information which may be requested by the building inspector to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
(b) Expedited review for building permits only. When a telecommunications facility will be a use as of right pursuant to sections 94-360 and 94-375 and requires only a building permit and design review before it may be erected, the building inspector will attempt to expedite review of the application and render a decision on the application within 15 business days after receipt of a complete application.
(c) Special use permits.
(1) A request for a special use permit shall be initiated by application to the building inspector and handled in accordance with the special use permit provision of sections 94-360 and 94-375 of the Municipal Code. The planning commission may issue a special use permit under this section provided it shall have determined that all of the requirements of sections 94-360 and 94-375 have been satisfied and, further, that the benefits of and need for the proposed tower are greater than any possible depreciating effects and damage to the neighboring properties.
(2) In granting a special use permit, the planning commission may impose additional zoning conditions to the extent determined necessary to buffer or otherwise minimize adverse effects of the proposed tower or antenna on surrounding properties.
(d) Variances.
(1) An applicant may seek a variance from the terms of this article after the building inspector informs him or her that the proposed site, tower, or any other matter is not in conformity with this article, by filing a written application for a variance with the planning commission. Said application shall contain all of the basic information required by this section for regular applications, as well as the basis for the variance.
(2) When an application for a variance is submitted the building inspector shall place or cause to be placed, a sign on the property where the facility is to be placed notifying the public of the application. In addition, a notice of the planning commission meeting shall be published once a week for two weeks prior to said meeting at which the variance is to be considered. The planning commission shall receive evidence and make a recommendation to grant or deny the variance to the city commission, which shall proceed to consider the application at the next available meeting, but no sooner than ten days after the decision of the planning commission. All proceedings and decisions of either body shall be supported by substantial evidence in a written record. Any parties aggrieved by a decision of either the planning commission or city commission shall have the right to appeal as set forth in sections 94-60 and 94-61.
(3) In considering a variance, both the planning commission and city commission shall consider, but not be limited by the standards contained in sections 94-60 and 94-61.
History
(Ord. No. 20-2008, 12-8-08)