--- title: Chamblee Zoning Ordinance, Section 230-9. Sustainable certification collection: local-codes id: local-code:chamblee/zoning/230-9 cite_as: Chamblee, Ga., Zoning Ordinance § 230-9 canonical_url: https://georgiacommons.org/code/local/chamblee/zoning/230-9 md_url: https://georgiacommons.org/code/local/chamblee/zoning/230-9.md text_url: https://georgiacommons.org/code/local/chamblee/zoning/230-9/text source_url: https://library.municode.com/ga/chamblee/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:chamblee jurisdiction_name: Chamblee place_fips: "1315172" corpus_version: local-codes-chamblee-d741f937264e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/chamblee/zoning/~appendix-a/~title-2/~chapter-230/~article-1.md previous: https://georgiacommons.org/code/local/chamblee/zoning/230-8.md next: https://georgiacommons.org/code/local/chamblee/zoning/230-10.md index: https://georgiacommons.org/code/local/chamblee.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:chamblee/zoning/230-9@2026-11-14-257e61d51d --- # Chamblee Zoning Ordinance, Section 230-9. Sustainable certification > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. > Tables are shown as their rows, with the cells separated by a bar ( | ). Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 2 - LAND USE AND ZONING / Chapter 230 - STANDARDS APPLYING TO ALL DISTRICTS / Article 1 - ZONING PROVISIONS (a) Intent. The City of Chamblee is committed to minimizing the short-term and long-term negative impacts construction has on the environment. The intent of this section is to provide owners and occupants of commercial buildings, offices, industrial buildings, multiple residences and senior citizen multiple residences with energy and water savings; good indoor air quality and healthy, pleasant and productive surroundings. A further intent of this section is to benefit the community by having buildings constructed that are resource-efficient and conserve energy. (b) Required Certification. Certification through EarthCraft (any level), LEED (any level), Green Globes (three (3) globes minimum to receive credit for this measure), National Green Building Standard (NGBS) (silver minimum to receive credit for this measure), or another comparable third-party certification program approved by the Planning and Development Director. (c) Applicability. This section shall be applicable to all new construction of a commercial building, office building, industrial building, parking garage, or multifamily residential building equal to or greater than 20,000 square feet of gross floor area. Furthermore, this section shall be applicable to all new construction of municipal buildings, regardless of square footage. (d) Sustainable Certification Checklist. (1) Every applicant who files a building permit application for construction of a commercial, industrial, office, or multifamily building equal to or greater than 20,000 square feet of gross floor area, shall provide a completed registration for an approved certification program in a format acceptable to the Planning and Development Director. (2) A building permit shall not be issued unless the LEED checklist, Green Globes checklist, or other approved certification program checklist shows that the proposed building will achieve enough points to attain the required certification level. No applicant shall be issued any building permits until the following are submitted and reviewed: (1) copies of the LEED checklist (or alternative certification); and (2) the registration of the proposed project with the USGBC (United States Green Building Council), or in the alternative, the registration of the project with the proper agency. (e) Sustainable Certification Closeout. No Certificate of Occupancy shall be issued unless and until the applicant produces verifiable documentation from the USGBC or GBI which affirms that the project is certified. However, upon completion of construction, satisfactory inspection by the Planning and Development Director and confirmation that all documentation has been submitted for required certification, the Planning and Development Director may issue a Certificate of Occupancy. Prior to issuance of a Certificate of Occupancy, the applicant shall submit a performance bond to ensure successful completion of the certification as set forth below. If the developer achieves certification status, the bond shall be released to the applicant. Sustainable Certification Bond Table Certification Bonds | 20,000—50,000 square feet | More than 50,000 square feet Combined Design and Construction Review | $10,000.00 | $20,000.00 (f) Sustainability Measures. (1) Applicability. The sustainable development measures in this section shall be addressed by any new buildings and/or any redevelopment in excess of the 70 percent threshold outlined in Section 270-9, Redevelopment Thresholds that are exempt or not required to comply with the Sustainable Certification requirements of Section 230-9. (2) Exemptions. Single-family detached residential construction shall be exempt from the sustainability measures of this section. (3) Calculation and Evaluation. a. Minimum Points Required. 1. All projects, unless otherwise noted, shall achieve a minimum of 5 points from any combination of the sustainable development measures as valued in Figure 230-9 "Sustainability Measures & Values." 2. No partial points will be accepted. b. Minimum Requirements of the Measure. All points shall be awarded based on meeting the minimum requirements of each sustainability measure, as indicated in this section or elsewhere in the UDO. c. Newly Constructed Measures. Measures count only if they are part of the new development application; measures already in place at the time of application do not count, unless clearly shown on the plans and approved by the Planning and Development Director. d. Required Documentation. The following documentation is required: 1. Documentation of which measures and total number of points the applicant will achieve shall be indicated on the Development Permit application submitted to the City. 2. Documentation is required to clearly illustrate the extent to which the minimum requirements of each of the selected measures is to be met through permanent construction or policies. (4) Energy Category Measures. a. Energy Efficiency. Newly constructed buildings must demonstrate an average 10 percent improvement over the energy code currently in effect in the city. To receive credit for this measure, calculations shall be provided that compare the energy code requirements to the performance of the proposed building. b. Renewable Energy. Incorporate renewable energy generation on-site with production capacity of at least 5 percent of the building's annual electric or thermal energy, established through an accepted building energy performance simulation tool. The following renewable energy generation sources are applicable: solar thermal or photovoltaics, ground-sourced heating or cooling, fuel cells and micro-turbines using non-fossil fuel and wind energy conversion. Other means of generating electricity without using a fuel, such as kinetic, heat exchange, approved by the Planning and Development Director. c. Green Roof. Install a vegetated roof for at least 50 percent of any building roof area or roof deck; a minimum of 2,500 square feet is required to receive credit. d. Heat Island Reduction. Use any combination of the following strategies for 35 percent of all on-site, non-roof hardscape areas, including sidewalks, plazas, courtyards, parking lots, parking structures, and driveway: coverage of the surface at canopy tree maturity in 15 years, and/or solar reflective paving and roofing with a SRI (solar reflectance index) of at least 29. e. Energy Efficient Fixtures. Installation of ENERGY STAR appliances and LED light bulbs for a minimum of 80 percent of the fixtures and equipment. If there is not an ENERGY STAR option available in the market, those fixtures do not need to be included in the calculation. (5) Water Category Measures. a. Building Water Efficiency. All new plumbing fixtures installed shall be WaterSense labeled with the following minimum efficiency rates: 1. Toilets: 1.1 gpf; 2. Urinals: 0.125 gpf 3. Faucets/aerator: 1.0 gpm, unless a higher flow rate is dictated by sink use (e.g.: kitchen prep sink). b. Water-Efficient Landscaping. Reduce potable water used for landscape irrigation by 50 percent from a calculated midsummer baseline case by using either one of the following methods: utilizing all xeriscape plant materials and providing no permanent irrigation system, or using only captured rainwater with an irrigation system. c. Pervious Pavement. Install an open grid or pervious pavement system that is at least 40 percent pervious on 65 percent of all hardscape surface areas, including sidewalks, plazas, courtyards, parking lots, and driveways. The water shall be directed into the groundwater or other acceptable storm accommodation per the Planning and Development Director. d. Water Reclamation. Install a water collection device to be used in lieu of potable water for irrigation, water features, etc. not already required by this chapter. e. Green Infrastructure. Install bioswales or other green infrastructure practices in lieu of a minimum of 10 percent (10%) traditional stormwater facilities. Easements shall be recorded at DeKalb Superior Court with a minimum radius extending five (5) feet out from the bioswale boundaries to ensure installments are maintained in perpetuity. (6) Transportation Category Measures. a. Lockable enclosed bicycle storage. Provide secure, enclosed bicycle storage space for 10 percent of building occupancy with no more than 10 spaces required. b. Bicycle. 1. Repair Center. Provide a designated bicycle repair center open to the public and consisting of, at least one air pump, water, and basic tools for minor repairs. c. Transportation Access. Site must be within 1/4 mile of an existing or proposed transit stop with provision of enhanced access to transit and shall include one or more of the following: 1. Construction of a bus turnout on development property or in adjacent street right-of-way and appropriate dedication. 2. Construction of shared use paths installed with a minimum of 12 feet of width. 3. Provision of direct platform connection to rail station. 4. Additional easement for provision or enhancement of transit. 5. Construction of bus stop improvements on or directly adjacent to the subject property, subject to the review and approval of MARTA and the Planning and Development Director. 6. Installation of provisions for access by Shared Autonomous Vehicles (SAVs). 7. Other items approved by the Planning and Development Director. (7) Tree Canopy Category Measures. a. Full-Site Preservation. Preserve all existing trees over six (6) inches DBH on the development site. b. Surplus Tree Planting. Addition of ten percent (10%) improvement over the tree canopy requirements above any City regulations, provided the additional tree canopy is advisable and willnot impact overall survivability or health of existing or added trees. Tree varieties shall be large deciduous shade trees. c. Specimen Tree Preservation. Preservation of a minimum of two (2) specimen trees on the property. d. Tree Stand Preservation. Preservation of a contiguous grouping of specimen trees and other high-value trees. Determination is based upon the following criteria: 1. A relatively mature, even-aged stand. 2. A stand with purity of species composition or of a rare or unusual nature. 3. A stand of historical significance. 4. A stand with exceptional aesthetic quality. (8) Alternative Measure. The applicant may submit an alternative sustainable development measure for approval by the Planning and Development Director. The measure shall further a sustainability goal and shall not be considered standard practice for current developments. The measure shall be unrelated to any of the other measures defined in this Section. Based upon their review, the Planning and Development Director shall approve for the number of points to be awarded. Required documentation shall clearly illustrate that the measure furthers a sustainability goal. Figure 230-9 Sustainability Measures and Values MEASURES | VALUE ENERGY CATEGORY | Building Energy Efficiency | 3 points Renewable Energy Sources | 5 points Green Roof | 4 points Heat Island Reduction | 2 points Energy Efficient Fixtures | 1 point WATER CATEGORY | Building Water Efficiency | 2 points Water-Efficient Landscaping | 1 point Pervious Pavement | 2 points Water Reclamation | 1 point Green Infrastructure TRANSPORTATION CATEGORY | Lockable enclosed bicycle storage | 1 point Bicycle Repair Center | 1 point Transportation Access | 4 points TREE CANOPY CATEGORY | Full Site Preservation | 3 points Surplus Tree Planting | 2 points Specimen Tree Preservation | 1 point Tree Stand Preservation | 1 point ALTERNATIVE | Alternative Measure | 1 to 3 points ## History (Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18; Ord. No. 776, 12-17-19; Ord. No. 805, 12-21-21)