--- title: Chamblee Zoning Ordinance, Section 280-54. Required contents of a traffic impact study collection: local-codes id: local-code:chamblee/zoning/280-54 cite_as: Chamblee, Ga., Zoning Ordinance ยง 280-54 canonical_url: https://georgiacommons.org/code/local/chamblee/zoning/280-54 md_url: https://georgiacommons.org/code/local/chamblee/zoning/280-54.md text_url: https://georgiacommons.org/code/local/chamblee/zoning/280-54/text source_url: https://library.municode.com/ga/chamblee/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:chamblee jurisdiction_name: Chamblee place_fips: "1315172" corpus_version: local-codes-chamblee-d741f937264e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/chamblee/zoning/~appendix-a/~title-2/~chapter-280/~article-7.md previous: https://georgiacommons.org/code/local/chamblee/zoning/280-53.md next: https://georgiacommons.org/code/local/chamblee/zoning/280-55.md index: https://georgiacommons.org/code/local/chamblee.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:chamblee/zoning/280-54@2026-11-14-1eee1e4ddb --- # Chamblee Zoning Ordinance, Section 280-54. Required contents of a traffic impact study > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 2 - LAND USE AND ZONING / Chapter 280 - PROCEDURES / Article 7 - TRAFFIC IMPACT STUDIES The traffic impact study shall be prepared following and meeting the standards of the GRTA Development of Regional Impact technical guidelines, dated January 14, 2002, as may be amended from time to time. In addition, the following components shall be included: (1) Existing, proposed, and needed multi-modal transportation (walking, bicycling, transit, etc.) options. (2) References. A listing of all technical documents and resources cited or consulted in preparing the traffic impact study. (3) Technical Appendix. Relevant technical information, including but not limited to: copies of raw traffic count data used in the analysis, calculation sheets and/or computer software output for all LOS and V/C calculations in the analysis, and warrant worksheets for signals, turn lanes, signal phasing, etc. used in the analysis. (4) Mitigation Measures and Costs. Listing of all intersections and road segments that are forecasted to be Level of Service "E" and "F" in the horizon year, or if phased, in the years that each phase is planned to be complete, and an identification and description of specific mitigation measures including signal, turn lane, or other warrant analyses as appropriate and necessary to bring these intersections and road segments into compliance with a Level of Service "D" or other city-adopted level of service for said road segment or intersection. a. If roadway improvements are needed, the study shall show a drawing at an engineering scale of 1" = 20' for all recommended lane configurations. b. If signalization is warranted by the traffic signal warrants outlined in the Manual on Uniform Traffic Control Devices (MUTCD), a warrant analysis shall also be conducted as a part of the traffic impact study. If a traffic signal is warranted, the warrant package in the study shall show a drawing at an engineering scale of 1" = 20', detailing the signal design and phasing plans. c. The estimated cost associated with implementing all such mitigation measures shall be provided in the traffic impact study. The traffic impact study may take into account any city/county/state-approved roadway, traffic signalization and other improvements in determining mitigation measures and providing recommendations. ## History (Ord. No. 757, 12-18-18)