(a) Application and plat required. The owner of the land where the proposed development is to occur, or the owner's authorized agent, must file a plat with the Planning and Development Department along with an application for approval. The application must: (1) Be made on forms prepared by the Planning and Development Department; (2) Be accompanied by a plat prepared by a Georgia licensed civil engineer, surveyor, architect, or landscape architect, as described in these regulations and complying in all respects with these regulations; and (3) Be accompanied by an application fee in the amount set by the City Council. (b) Plat information. The following information must be shown on the preliminary plat: (1) The boundary, as determined by survey, of the area to be subdivided with all bearings and distances shown and the location within the area, or contiguous to it, of any existing streets, railroad lines, watercourses, easements or other significant features of the tract. (2) Scale denoted both graphically and numerically with north arrow and declination. (3) Complete construction plans, in accordance with the requirements in Section 300-34, as applicable, prepared by a registered engineer and approved by the City and the appropriate state agency. (4) The location of proposed streets, alleys, easements, lots, parks or other open spaces, reservations (i.e., school sites), property lines with street dimensions, tentative lot dimensions, lot and block numbers, and the location of any building restriction areas, i.e., flood hazard areas, watershed protection districts, wetlands. Site calculations shall include total acreage of tract, acreage in parks and other nonresidential uses, total number and acreage of parcels, and the total number of housing units. (5) The proposed name of the subdivision, street names, the owners name and address, signature of the owner or owner's duly authorized agent, the name of the surveyor, the names of adjoining subdivisions or property owners, the name of the City, county, and state in which the subdivision is located, the date of plat preparation, and the zoning classification of the tract to be subdivided and of adjoining properties. (6) Typical cross sections of proposed streets showing rights-of-way, pavement widths, grades, and design engineering data for all corners and curves. Where a proposed street is an extension of an existing street the profile of the street shall include 300 feet of the existing roadway, with a cross section of the existing street. Where a proposed street within the subdivision abuts a tract of land that adjoins the subdivision and where said street may be expected to extend into said adjoining tract of land, the profile shall be extended to include 300 feet of the said adjoining tract. (7) The location of any existing or proposed demolition landfills in the site. Such sites shall not be used for building. (8) A timetable for estimated project completion for each phase covered by the preliminary plat. (9) The following wording must be shown on the preliminary plat: "This preliminary plat has been submitted to and approved by the City of Chamblee, on this day of , .\ By: (By Dir.) Planning and Development Director, City of Chamblee, Georgia" (10) Any additional information deemed necessary by the Planning and Development Department to determine compliance with ordinance standards. (c) In addition to the above required information, the following additional information may be necessary for unique sites: (1) Original contours for the entire area to be subdivided and extending into adjoining property for a distance of 300 feet at all points where street rights-of-way connect to the adjoining property. (2) Where a proposed water and sewer system does not contemplate the use of facilities owned and operated by the City or a sanitary district, the proposed facility plans as approved by the appropriate agency, shall be submitted with the preliminary application. (d) Application submittal. (1) An application will be considered complete and ready for processing only when it fully complies with the requirements of this chapter. (2) If the application and preliminary plat are not accepted, the Planning and Development Director must inform the applicant of the deficiencies and request the applicant to resubmit the application and preliminary plat with the additional information. (e) Referral of preliminary plat for review. (1) Upon official acceptance of the application and the preliminary plat, the Planning and Development Department, Public Works, and any other city or county department the Planning and Development Director determines should be consulted for the particularities of the proposed subdivision, shall review the preliminary plat. As part of its review, each such department and receiving entity must make comments and recommendations regarding any required changes necessary to comply with all applicable regulations. Once the Planning and Development Director has received each department's comments and recommendations, the Planning and Development Director must either notify the applicant that the preliminary plat has been approved or notify the applicant that revisions to the plat are required. (2) The Planning and Development Director shall approve the preliminary plat if the application and preliminary plat conform to all requested revisions, the requirements of this UDO and state law and must deny the preliminary plat if the application and preliminary plat do not conform to all requested revisions, and the requirements of this Code or state law. (3) If a preliminary plat is not approved within 180 days of the official acceptance of the application, the application and preliminary plat is considered withdrawn without further action by the City. (f) Compliance with design and improvement standards and approval criteria. (1) Subdivisions are subject to compliance with all applicable land development regulations in Title 3. (2) The Planning and Development Director may require the applicant to submit a site plan for any lot to demonstrate that the lot contains adequate buildable area that is suitable for the intended use. (g) After review of the preliminary plat and related comments, and where, in the judgment of the Planning and Development Director, the preliminary plat conforms to all of the requirements of this UDO, the preliminary plat shall stand approved. (h) Effect of approval. The preliminary plat does not constitute nor provide assurance of approval of the final plat or building or development permits, but is to be used as the development design for the subdivision and for the acquisition of a development permit as provided for in the UDO. The preliminary plat must be submitted to the Planning and Development Department in a digital format acceptable to the City, prior to or simultaneous with an application for a development permit. (i) Lapse of approval. The preliminary plat expires 24 months from the date of its approval. If more than 50 percent of linear feet of total road in the entire development shown on the preliminary plat is complete at the expiration of 24 months from the date of the approval of the preliminary plat, then the Planning and Development Director is authorized to grant a one-time, one-year extension of the approval of the preliminary plat. An expired preliminary plat is null and void and is of no effect. An expired preliminary plat may not be renewed. (j) Preliminary plat amendments. If the approved preliminary plat is amended or altered by the applicant after approval as a preliminary plat, then the applicant is required to note any discrepancies on the final plat.