When required, grading plans shall include: (1) All information required under Subsection 300-24(b) (unless included elsewhere in the plans); (2) Topographic layout proposed grading of the development must be at two-foot (maximum) contour intervals based on mean sea level datum; (3) Site grading plans superimposed over existing drainage structures. Drainage area that contributes to each existing structure shall be specified or shown; (4) Location, and construction details, and design criteria of accessory structures (headwalls, drainage ditches, catch basins, junction boxes, drop inlets, retention areas, and retention outlet controls) shall be provided on plan and/or detail sheet; (5) Maximum cross-slope on sidewalks is three percent, on other pavement, six percent; (6) Northern and eastern coordinates shall be shown for all stormwater and sanitary sewer appurtenances; (7) Bicycle and/or pedestrian-safe grates specified as appropriate for all drain inlets; (8) Top and bottom elevations indicated for all walls, steps and ramps; (9) Drainage at intersections indicated by flow arrows on plan; (10) The 100-year floodplain limits and elevations, or note absence (specify latest floodplain map and panel); (11) Structural detail and dimension of the detention pond including section through detention pond, dam or wall; (12) All retaining walls over four feet in height must be certified by a structural engineer licensed in the State of Georgia; (13) Ingress/egress easement from a public street to stormwater detention structure and maintenance easement to include the surface area ten feet outside the area inundated by the 100-year storm event. The ingress/egress easement shall be a minimum of 20 feet wide with a grade of 20 percent or less; (14) Detail of outlet control structure; (15) Show limits of actual grading (plus ten-foot grading buffer at the bottom of proposed slopes) outside of the root protection zone for all trees to remain; (16) Establish easements for dedication of all stormwater drainage features directing concentrated flows across property lines as directed by the City; (17) All development must satisfy the requirements of this UDO concerning potential flood areas; (18) Show or indicate whether the site is part of and in compliance with a master/parent stormwater management plan; (19) Water quality BMPs as recommended in the 2016 edition of the Georgia Stormwater Management Manual, Volumes 1, 2 and 3. For any project that requires a land disturbance permit the project shall consider water quality. The following BMPs may be used: a. Wet ponds (extended detention for less than 20 acres)—ED-micro pool; b. Extended dry detention ponds; c. Wetland-constructed; d. Infiltration trenches; e. Dry swales; f. Sand filter; g. Bio-retention; h. Vegetated filtration systems; and i. Any other best management practice approved by the City Engineer.