--- title: Chamblee Zoning Ordinance, Section 300-38. Storm drainage profile drawing collection: local-codes id: local-code:chamblee/zoning/300-38 cite_as: Chamblee, Ga., Zoning Ordinance § 300-38 canonical_url: https://georgiacommons.org/code/local/chamblee/zoning/300-38 md_url: https://georgiacommons.org/code/local/chamblee/zoning/300-38.md text_url: https://georgiacommons.org/code/local/chamblee/zoning/300-38/text source_url: https://library.municode.com/ga/chamblee/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:chamblee jurisdiction_name: Chamblee place_fips: "1315172" corpus_version: local-codes-chamblee-d741f937264e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/chamblee/zoning/~appendix-a/~title-3/~chapter-300/~article-4.md previous: https://georgiacommons.org/code/local/chamblee/zoning/300-37.md next: https://georgiacommons.org/code/local/chamblee/zoning/300-39.md index: https://georgiacommons.org/code/local/chamblee.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:chamblee/zoning/300-38@2026-11-14-5dafacc3e4 --- # Chamblee Zoning Ordinance, Section 300-38. Storm drainage profile drawing > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 300 - SUBDIVISION AND DEVELOPMENT STANDARDS AND PROCEDURES / Article 4 - CONSTRUCTION PLANS AND INSPECTIONS When required, storm drainage profile drawings shall include: (1) All information required under Subsection 300-24(b) (unless included elsewhere in the plans); (2) Storm drainage profiles must be prepared to a scale no smaller than one inch = 100 feet horizontal × one inch = ten feet vertical; (3) Each profile should be labeled consistent with the labeling scheme used on the drainage plan view; (4) No main line storm pipe shall be less than 15 inches diameter; (roof laterals and landscape drainage are exempted from this requirement); (5) No pipe shall have a slope greater than 12 percent; (6) If a drop in a structure is greater than five feet, a reinforced base shall be provided for that structure; (7) The 25-year hydraulic grade line shall be shown for all storm pipes. The 100-year HGL shall be shown for all pipes within road rights-of-way; (8) No corrugated metal pipe shall be used in any road right-of-way; (9) All utility crossings shall be shown on storm profiles; (10) All structures shall be labeled as to type and function using standard county or GDOT call outs; (11) No outfall pipe shall have a slope greater than one percent. Maximum allowable velocity for storm sewer exit pipe is ten feet per second when flowing full or half-full based on Manning's Formula. Energy dissipater is required for exit velocity in excess of five feet per second; (12) Rip-rap and/or concrete aprons other acceptable aprons shall be shown for all outfalls; (13) A pipe chart representing all sizing and capacity calculations, including but not limited to, pipe size, capacity, drainage area, velocity, and pipe material, shall be included; (14) The profile must show the existing and proposed elevations along the length of the drainage system; (15) Open channel design must show the grade of the flow line of the channel and include a typical ditch section that provides a non-erodible velocity at design flows. Channel slopes less than one percent may be grassed; for channel shapes greater than one but less than three percent the designer must demonstrate calculated velocity at or less than five feet per second including a channel lining for design to accommodate the design philosophy; channel slopes over three percent must be approved by the City; (16) Channel lining (i.e., grass, concrete, etc.) must be specified along the profile; (17) Pipe material and bedding shall be specified; (18) Crown elevations must be matched at each junction structure or the upstream crown must be higher than the downstream crown; and (19) Shall be compliant with the requirements of Chapter 340, Article 4, Post-Development Stormwater Management. ## History (Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18; Ord. No. 805, 12-21-21)