Skip to content
Georgia Commons
Menu

Chamblee · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 310 - ENVIRONMENTAL STANDARDS / Article 1 - SOIL EROSION, SEDIMENTATION AND POLLUTION

Section 310-1. Applicability.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) In order to prevent soil erosion and sedimentation pollution of streams, springs, flat water bodies, or other drainage networks, all land-disturbing activities shall comply with all requirements of the Georgia Department of Natural Resources standards and specifications and any locally adopted sediment control ordinances.

(b) Land-disturbing activities shall cause all grading, excavations, open cuts, side slopes, and other land surface disturbances to be mulched, seeded, sodded, or otherwise protected. Temporary erosion and sedimentation control measures shall be placed as required by this UDO.

(c) Erosion and sedimentation from land disturbance activities of less than one acre shall be controlled with silt fencing to prevent siltation of adjoining parcels, lots and streets.

History

The history line the source prints at the end of the section.

(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:chamblee/zoning/310-1@2026-11-14-f716ded5f5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Chamblee Zoning Ordinance, Section 310-1. Applicability | Georgia Commons