Section 320-14. Standards for construction buffers.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Where Required. Construction buffers may be required by the Mayor and Council as a condition of its approval of any action.
(b) Time constraints. Construction buffers shall be in effect during the construction of a project until a Certificate of Completion is approved. In the case of a residential subdivision, a construction buffer shall terminate upon each individual lot with the issuance of a Certificate of Occupancy for each principal dwelling.
(c) Disturbance or encroachments.
(1) Construction buffers shall be natural, undisturbed and free of encroachments except as otherwise authorized by the Planning and Development Department.
(2) Sediment basins must be located outside of a required construction buffer.
(3) Natural bottom stormwater ponds and their appurtenant structures that do not require grading and removal of trees may encroach upon the construction buffer. See Chapter 340, Article 4 for additional regulations for stormwater management practices.
(4) Ditches, swales, stormwater conveyance facilities, stormwater detention ponds, sediment basins, sanitary sewer conveyance facilities, similar facilities, and any associated easements may not encroach into a construction buffer except for perpendicular crossings by water, sewer or stormwater pipes.
(5) If the construction buffer on a residential lot is devoid of existing trees and vegetation and is documented by a tree survey prior to conducting land-disturbing activities on the lot, the Planning and Development Director may authorize the encroachment of a building or structure into the construction buffer for a distance not to exceed 10 feet.
(d) Protection during land-disturbing activities.
(1) Prior to initiating land-disturbing activities, construction buffers shall be clearly marked in the field and shall be continuously protected during construction.
(2) The Planning and Development Director shall review and approve the method of demarcation and protection in accordance with best management practices.
History
(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18)