Chamblee · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 340 - STORMWATER MANAGEMENT / Article 4 - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

Section 340-38. Permit procedures and requirements.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Permit application requirements.

(1) No owner or developer shall perform any land development activities without first meeting the requirements of this Article prior to commencing the proposed activity.

(2) Unless specifically exempted by this Article, any owner or developer proposing a land development activity shall submit to the City a permit application on a form provided by the City for that purpose.

(3) Unless otherwise exempted by this Article, a permit application shall be accompanied by the following items in order to be considered:

a. Stormwater concept plan and consultation meeting certification in accordance with Subsection 340-38(b);

b. Stormwater management plan in accordance with Subsection 340-38(c);

c. Inspection and maintenance agreement in accordance with Subsection 340-38(d), if applicable;

d. Performance bond in accordance with Section 300-27, if applicable; and

e. Permit application and plan review fees in accordance with Subsection 340-38(e).

(b) Stormwater concept plan and consultation meeting.

(1) Before any stormwater management permit application is submitted, it is recommended that the land owner or developer shall meet with the City for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting shall take place at the time of the preliminary plan of subdivision or other early step in the development process and may be coordinated with the pre-application conference required by Section 300-6. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.

(2) Applicants must request a consultation meeting with the City when applying for a Determination of Infeasibility through the Practicability Policy.

(3) To accomplish this goal the following information shall be included in the concept plan which shall be submitted in advance of the meeting:

a. Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces.

b. Natural resources inventory. A written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.

c. Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

d. Any local watershed plans, greenspace projection plans (if applicable), and any relevant resource protection plans will be consulted in the discussion of the concept plan.

(c) Stormwater management plan requirements.

(1) The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this Article, including the performance criteria set forth in Section 340-39.

(2) The plan shall be in accordance with the criteria established in this section and be prepared under the direct supervisory control of either a professional engineer or landscape architect licensed in the State of Georgia. Subsections c, d, e, and f of Subsection 340-38(c)(3) shall be prepared under the direct supervisory control of a professional engineer licensed in the State of Georgia, who shall seal and sign the work. The landscaping and open space plan (see Subsection 340-38(c)(3)h.) shall be prepared under the direct supervisory control of a registered landscape architect, who shall seal and sign the work. Portions of the overall plan may be prepared and stamped by a registered land surveyor licensed in the State of Georgia as appropriate, such as boundary surveys, contour maps, erosion and sedimentation control plans.

(3) The stormwater management plan must ensure that the requirements and criteria in this Article are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan guidance and general landscape guidelines found in the 2016 edition of the Georgia Stormwater Management Manual and the plan review checklist provided by the City. This includes:

a. Common address and legal description of site;

b. Vicinity map;

c. Existing conditions hydrologic analysis. The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land cover of areas for each sub-basin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, pre-development conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities;

d. Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of post-development impervious surfaces and other land cover areas for each sub-basin affected by the project; calculations for determining the runoff volumes that need to be addressed for each sub-basin for the development project to meet the post-development stormwater management performance criteria in Section 340-39; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in Section 340-39 must be met for the stormwater runoff from the entire site;

e. Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: a map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in Section 340-39; drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace protection plan;

f. Post-development downstream analysis. A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in report form and shall address every point or area along the project site in accordance with the 2016 edition of the Georgia Stormwater Management Manual;

g. Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with Chapter 310, Article 1, Soil Erosion, Sedimentation and Pollution or NPDES permit for construction activities. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls;

h. Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved. The minimum landscape plan requirements shall include a planting plan and schedule and associated details and specifications. The minimum planting sizes shall be as follows: Two-inch caliper for trees, three-gallon pots for shrubs, and four-inch pots for ground cover. Vegetation shall be spaced appropriately to establish mature plant growth. The minimum coverage percentages after one year of establishment for stormwater structural control measures within the stormwater design manual shall be 75 percent coverage for stormwater ponds, stormwater wetlands, biorention areas, submerged gravel wetlands, and dry detention/dry extended detention basins and 90 percent coverage for sand filters, enhanced swales, infiltration trenches, filter strips, grassed channels and organic filters;

i. Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices, including their associated landscaping measures to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice, including their associated landscaping measures that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan. The landscape maintenance plan shall include: inspection periods, mulching frequency, removal and replacement of dead and diseased vegetation, treatment of diseased trees, watering schedule after initial installation, and repair and replacement of staking and wires;

j. Maintenance access easements. The applicant must ensure access from public right-of-way to stormwater management facilities, stormwater conveyance facilities that are designed to carry runoff from more than one parcel, and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded in the deed records of the clerk of superior court of the county and shall remain in effect even with the transfer of title of the property. Proof of the recorded plat or document shall be submitted to the City prior to final inspection and approval;

k. Inspection and maintenance agreements. The applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice, including their associated landscaping measures in accordance with Subsection 340-38(d);

l. Evidence of acquisition of applicable local and nonlocal permits. The applicant shall certify and provide documentation to the City that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan;

m. Indemnity agreement. An indemnity agreement shall be signed by the property owner and submitted to the City prior to final inspection and approval; and

n. Determination of Infeasibility (if applicable).

(d) Application procedure.

(1) Applications for land development permits shall be filed with the City as provided in Chapter 300.

(2) Permit applications shall include the items set forth in Subsection 340-38(c) above, (two copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included).

(3) The City shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved.

(4) If the permit application, stormwater management plan or inspection and maintenance agreement are disapproved, the City shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which Subsection (f)(3) above, and this subsection shall apply to such resubmittal.

(5) Upon a finding by the City that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this Article, the City may issue a permit for the land development project, provided all other legal requirements for the issuance of such permit have been met as provided in Section 300-34.

(6) Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements:

a. The applicant shall comply with all applicable requirements of the approved plan and this Article and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan;

b. The land development project shall be conducted only within the area specified in the approved plan;

c. The City shall be allowed to conduct periodic inspections of the project;

d. No changes may be made to an approved plan without review and written approval by the City; and

e. Upon completion of the project, the applicant or other responsible person shall submit the engineer's report or landscape architect's report and certificate and as-built plans required by Subsection 340-40(b).

(e) Application review fees. The fee for review of any stormwater management application shall be based on the fee structure established by the City and shall be made prior to the issuance of any building permit for the development.

(f) Modifications for off-site facilities.

(1) The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. All property owners participating in the off-site or regional facility shall sign an agreement regarding use of the facility and how the overall capacity is accounted for on a form provided by the City. Future modifications to participating properties shall ensure adequate capacity within the off-site or regional facility, accounted for on an updated form provided by the City. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.

(2) A stormwater management plan must be submitted to the City which shows the adequacy of the off-site or regional facility.

(3) To be eligible for a modification, the applicant must demonstrate to the satisfaction of the City that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:

a. Increased threat of flood damage to public health, life and property;

b. Deterioration of existing culverts, bridges, dams and other structures;

c. Accelerated streambank or streambed erosion or siltation;

d. Degradation of in-stream biological functions or habitat; or

e. Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.

(g) Approval of proprietary structural controls.

(1) The following structural controls and conditions associated with devices are approved for use:

a. Devices approved under the New Jersey Department of Environmental Protection (NJDEP) Manufactured Treatment Devices Certification Program are approved for use in the city. The total suspended solids (TSS) removal rate to be used for the device shall be the same as that listed by NJDEP. Any conditions by the NJDEP required for use of the proprietary device shall be considered for site use applicability and/or shall be implemented into the stormwater management design and maintenance measures for the proposed new development or redevelopment.

b. Pretreatment and basic treatment devices approved under the State of Washington Department of Ecology Technology Assessment Protocol - Ecology (TAPE) Program with use level designations of conditional use level designation (CULD) and general use level designation (GULD) are approved for use in the city. Pretreatment devices shall have a TSS removal rate of 50 percent and basic treatment devices shall have a TSS removal rate of 80 percent. Any conditions by TAPE required for use of the proprietary device shall be considered for site use applicability and/or shall be implemented into the stormwater management design and maintenance measures for the proposed new development or redevelopment.

c. Proprietary structural control devices and associated conditions listed by the City as previously approved through the procedures described by Subsection 340-38(g)(2) may be approved for use in the city.

(2) Proprietary structural control reviews not approved for use described in this subsection may be used after review and approval by City Engineer in accordance with the provisions below:

a. The applicant shall submit a letter from the manufacturer stating which criterion under Subsection 340-38(g)(2)b. shall be the basis of the City's evaluation for review and necessary testing reports to prove that criterion was met. Also, provide as part of the device review: physical description; site requirements; sizing methodology; installation; operation and maintenance requirements; reliability; and other benefits and limitations associated with the use of this device. Describe how the device meets the chosen criterion from the submitted manufacturer data and what TSS removal rate is expected to be achieved by the device.

b. The City will evaluate the proposed structural device based on the applicable criterion described below:

1. The proprietary structural control is proven to be similar in function to a structural control measure listed within the 2016 edition of the Georgia Stormwater Management Manual. The proprietary structural control device shall be designed using the design guidelines associated with the similar structural control measures described with the stormwater design manual. The proprietary structural control device shall use the same TSS removal rate of the similar structural control measure listed within the stormwater design manual.

2. The proprietary structural control manufacturer provides adequate information that proves that the device meets the general intent of the guidelines listed within the 2016 edition of the Georgia Stormwater Management Manual for proprietary systems. However, where testing guidelines are not specifically listed in the 2016 edition of the Georgia Stormwater Management Manual, supplement with testing standards used by NJDEP Manufactured Treatment Devices Certification Program or State of Washington TAPE Program to allow uniform minimum criteria for review and comparison of these devices, such as: identifying which events to sample; selecting sampling locations; sampling methods; flow measurement methods; sample data quality assurance and control; analytical laboratory requirements; and calculating best management practices efficiencies. The TSS removal rate for the device will be assigned by the City from the information provided with the submittal.

3. The proprietary structural control manufacturer provides adequate information that proves that the device meets the general intent of the established guidelines for laboratory and/or field testing used by NJDEP Manufactured Treatment Devices Certification Program or State of Washington TAPE Program. The TSS removal rate for the device will be assigned by the City from the information provided with the submittal.

c. The City will then make a determination as to whether the proprietary structural control device is approved with any conditions and assign the TSS removal rate that shall be associated with the use of the device.

d. To obtain approval for use of this device for the proposed new development or redevelopment, all proposed proprietary devices shall submit site-specific design information as part of the stormwater management plan procedures described in Subsection 340-38(c) of this Article.

e. The City reserves the right to deny the use of any previously approved proprietary structural control device.

(h) Deviations from this Article. The Planning and Development Director may grant deviations of engineering performance criteria prescribed by this Article upon recommendation by the City Engineer that the stormwater management measures proposed for the new development or redevelopment meet the engineering performance criteria to the maximum extent technically feasible. All other requests for deviations from the terms of this Article may only be granted by the Mayor and Council under the procedures described within this subsection.

(1) General standards for application and approval.

a. Before any application is submitted for a deviation from the terms of this Article, the land owner or developer shall meet with the City staff for a consultation meeting to review a concept plan of the post-development stormwater management system to be utilized in the proposed land development project.

b. Request for applications for deviations from the terms of this Article shall be filed with the City Clerk.

c. All filed applications shall be reviewed by the appropriate City staff member and this staff member shall provide a written recommendation to the Mayor and City Council for a final decision.

d. Applications for deviations from the terms of this Article shall follow the variance provisions as set forth in Chapter 280, Article 4, Variances, of the UDO with the exception that the written analysis shall follow the criteria listed in Subsection 340-38(h)(1)e.

e. The Mayor and City Council shall authorize deviations from the terms of this Article only upon determination of each of the following:

1. There are extraordinary and exceptional conditions pertaining to the property in question because of its size, shape or topography;

2. The application of this Article to the property in question would create an unnecessary hardship to owner;

3. Such conditions are peculiar to the property in question;

4. Such conditions are not the result of any actions of the property owner; and

5. Relief, if granted, would not cause substantial detriment to the public good, nor impair the purposes or intent of this Article.

(2) Mayor and City Council hearings.

a. Before deciding a deviation from the terms of this Article, the Mayor and City Council shall provide for a hearing on the proposed action as set forth in Section 280-16 of the UDO.

b. The following provisions shall apply to applications for deviations from the terms of this Article: public notice as set forth in Section 280-15; sign postings as set forth in Subsection 280-15(b)(2) of the UDO; and written notices as set forth Subsection 280-15(b)(3)b of the UDO.

c. The Mayor and City Council shall make a "deviation decision" for each application. For purposes of this Article, the term "deviation decision" shall mean final action by the Mayor and City Council which results in an approval or denial of deviations from the terms of this Article.

d. A "deviation decision" shall be made no later than 60 days following an applicant's submittal of a complete application, unless extended by agreement with the applicant.

e. The Mayor and City Council may require accompanying written requirements as part of a "deviation decision", thereby approving the variance as "conditional."

f. An application may be withdrawn by the applicant prior to the "deviation decision."

g. Appeals of a "deviation decision" of the Mayor and City Council by an aggrieved party to the DeKalb County Superior Court shall be authorized pursuant to Section 280-32 of the UDO.

(i) Approval process for amenity pond/wetland located within restricted portions of site as described in Subsection 340-39(a)(5) of this Article.

(1) Before any request shall be submitted for an amenity pond/wetland located within restricted portion of the site as described in this section, the land owner or developer shall meet with the City for a consultation meeting to review a concept plan of the post-development stormwater management system to be utilized in the proposed land development project.

(2) Submit to the City an application for the amenity pond/wetland to be presented before council, which shall at a minimum include the following:

a. A site plan of the proposed development, showing the planned location and size of the amenity pond/wetland;

b. A grading plan of the site showing existing and proposed elevations;

c. A landscape plan of the proposed plantings within the amenity pond/wetland; and

d. A rendering of the amenity pond/wetland area that shows the concept design intent of the amenity pond/wetland area.

(3) At the council public hearing and work session, the City Council shall discuss the submitted application and provide decision at the following City Council meeting.

History

The history line the source prints at the end of the section.

(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18; Ord. No. 776, 12-17-19)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:chamblee/zoning/340-38@2026-11-14-32e4e4b67c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Chamblee Zoning Ordinance, Section 340-38. Permit procedures and requirements | Georgia Commons