Chamblee · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 350 - INFRASTRUCTURE / Article 3 - PUBLIC UTILITIES INSTALLATION
Section 350-25. Underground electric and communication utilities.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Undergrounding Utilities.
(1) Utilities, including telephone, electric power, and cable television in both public and private rights-of-way, shall be placed underground for all developments establishing new roads through the subdivision process outlined herein. Fee in lieu/alternative compliance are not permitted alternatives for this requirement.
(2) Utilities, including telephone, electric power and cable television in both public and private rights-of-way, shall be placed underground for all any new developments or redevelopments with total floor areas 20,000 s.f. or over and identified on the Underground Utilities Map as adopted and incorporated herein by reference.
(3) This requirement does not apply to high voltage power lines.
(b) Fee in lieu. The developer may request approval from the Planning and Development Director for a fee in lieu arrangement meeting the following:
(1) A City fund, known as the "The City of Chamblee Utility Conversion Fund" is hereby created. The purpose of said fund is to accept deposits as described herein, along with other funds or grants apportioned by the Mayor and City Council, and the use of such funds shall be restricted for the sole purpose of offsetting the cost of projects undertaken by the City that bury or relocate power lines from streets and sidewalks.
(2) The developer shall contribute toward the City's Utility Conversion Fund in lieu of requiring burial of the utilities. Such fee in lieu arrangement shall be based on a cost per linear foot of such underground relocation of utilities established by the Board of Mayor and Commissioners, and it may be adjusted from time to time by City Ordinance.
(c) Alternative Compliance. When extreme conditions prevent the developer from burying utilities or paying a fee in lieu, as determined by the Planning and Development Director, the developer shall meet a minimum of two of the following requirements beyond what is required by ordinance or any other alternative compliance credited elsewhere for other relief:
(1) Close or minimize the dimension of an existing deficient curb cut;
(2) Add architectural interest to improve the pedestrian experience (e.g.; patios, entrance vestibules, porte cochere, etc.);
(3) Provide additional landscape materials or large planters;
(4) Add active open space;
(5) Provide public art as approved by the Public Art Commission.
(d) Sequencing. Fee in lieu, alternative compliance, or burial of utilities shall be done prior to issuance of any Certificate of Occupancy being issued for structures in any phase abutting the right-of-way within which the overhead utilities are situated. The fee-in lieu option is not available for developments requiring utility burial under paragraph (a).
(e) In all single-family residential or commercial condominium developments:
(1) Individual systems for water, sewer, and HVAC shall be required for each unit.
(2) Individual metering shall be provided for all utilities.
(3) Easements for utility lines shall be provided in the common ownership area where lateral service connections shall take place.
History
(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18; Ord. No. 805, 12-21-21)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.