Non-conforming Strip Commercial\ Incremental re-investment of strip commercial and industrial properties is likely to occur along major corridors. The proposed block structure illustrates how surface parking can adapt and change over time into a mixed-use, walkable street framework. Existing strip commercial buildings generally include: • Few designated pedestrian connections to building entrances • Multiple entry points with no cross-parcel access or shared parking • Large surface parking with limited tree coverage creates heat islands Figure DG.7 - Existing Strip Commercial\ Adaptive Reuse of Strip Commercial Property\ Adaptive reuse of strip commercial buildings should: • Provide connections between parking lots. • Locate all new parking at rear of building. • Screen and locate dumpsters at rear of building. • Create direct pedestrian connections between building entrance and parking. • Incorporate massing changes to emphasize building entrance. • Encourage new commercial development to front key streets, limit blank walls, and provide pedestrian-scale amenities. • Parking lot landscaping: one tree per 10 parking spaces. • Encourage stub-outs for future connections. • Provide landscaped buffer for adjacent non-commercial uses. Figure DG.8 - Adaptive Re-use of Strip Commercial\ [2] June 11, 2015\ (Revised May 18, 2016) On October 20, 1998, the City of Chamblee unanimously passed a Tree Preservation Ordinance, which was most recently revised in 2014 and combined with the City's zoning buffer and landscaping ordinances within one ordinance (Chapter 320 of the Unified Development Ordinance). This ordinance provides standards for the preservation and/or replacement of the City of Chamblee's trees and requirements for zoning buffers and landscape areas. What follows are the administrative guidelines to be considered during the permitting process in coordination with Chapter 320 requirements. These guidelines have been approved by the City Landscape Coordinator and by the Chamblee City Council. Any questions about these guidelines or about the permitting process should be directed to the Development Director at 470-395-2333. Table of Contents\ | | | |----|----| | 2.1. Tree Preservation and Protection Fee Schedule ..... | 5 | | 2.2. Plant Species Selection List for Permanent Buffers ..... | 7 | | 2.3. Tree Species Selection List: Parking Lots/Landscape Strlp/Streetscape, Overstory & Understory Trees ..... | 10 | | 2.4. Trees Appropriate for Planting in GDOT Right-of-Way ..... | 11 | | 2.5. Trees Appropriate for Planting in GDOT Right-of-Way within 500-foot Billboard Zone ..... | 11 | | 2.6. Acceptable Mulching Materials ..... | 12 | | 2.7. Invasive Species List ..... | 14 | | 2.8. Bioretention Area Species Selection List ..... | 17 | | 2.9. Standard Details ..... | 19 |