Principal building setbacks (in feet) shall be as follows: District Front, arterial or collector streets Front, other streets Side Rear R-1 40 25 10 20 R-2 40 20 7 15 R-3 40 15 5 10 MHP PUD As approved on site plans *NS 60 40 10a 20a HB 60 40 5b 10b CBD Nonec Nonec Nonec Nonec M-1 60 40 5b 10b A-1 60 25 10 20 Additional setbacks may be required for specific uses as provided in permitted uses sections of particular zoning districts. *See section 46-237. a When development in this district abuts an A-1, R-1, R-2 or R-3 zoning district boundary, a buffer with a minimum width of 15 feet shall be provided along the entire property line abutting the zoning district. b When development in this district abuts an A-1, R-1, R-2 or R-3 zoning district boundary, a buffer with a minimum width of 30 feet shall be provided along the entire property line abutting the district. c No new building shall be constructed with a setback greater than five feet from any front property line or public right-of-way, if adjacent lots are occupied with buildings erected within five feet of the front property line or public right-of-way. No new building shall be constructed with more than one side yard if adjacent lots are occupied with buildings erected within two feet of the side property line.