Skip to content
Georgia Commons
Menu

Coffee County · Zoning Ordinance

Appendix D - LAND DEVELOPMENT CODE / Chapter 4 - DEVELOPMENT STANDARDS

2.6. Chapter 5 Section 35 Supplemental

About this text

  • As published by Municode, current through 2024-10-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Standards 120 Chapter 5 Section 34 Supplemental Standards R-3 Residential, Single Family incl. Manufactured Homes 2 21, 780(a) 70 600 60 30 15(b) 8 20 40 30 Residential, Single Family incl. Manufactured Homes 6 7,000 (d) 70 600 60 30 15(b) 8 20 40 30 R4 Residential SingleFamily 4 10,890(d) 80 1,000 60 30 10 10 25 40 40 R-P Residential Professional Non-residential Pro- fessional Uses 2(a) 21,780 80 1,000 60 30 20 10 25 40 40 Residential, Single Family

2 21,780 (a) 80 1,000 60 30 20 10 25 40 40 Residential, Single Family incl. Manufactured Homes 6 7,000 (d) 70 1,000 30 30 15(b) 8 20 40 30 Table 4-1 Dimensional Requirements Zoning District Maximum Density (units per acre) Minimum Lot Size (sf) Minimum Lot Width (ft.) at front building line Minimum Heated Floor Area per Dwelling Unit (sf) Minimum Road Frontage (ft.)

Minimum Yard Maximum Height (ft.)

Max Impervious Lot Coverage (%) Front Rear Side Side @ corner C Commercial-General 10,000 (d) 70 60 30 20 10 20 50 (c)(e) 75 W-LI Light-Industrial 20,000 (d) 100 60 30 20 15 20 50 (c) 75 H-I Heavy-Industrial 20,000 (d) 100 60 30 20 15 20 50 (c) 75 PD Planned Development Please refer to Section 4-8 and as approved by County Commission as part of the Planned Development Ordinance for a specific project.

(a) Provided lot has on-site sewer but is otherwise served by a community water system, the minimum lot size shall be 21,780 sq. per unit. If served by on-site sewer and on-site well, minimum lot size shall be 43,560 square feet per unit. (See Department of Health Regulations)

(b) For enclosed small garden sheds, greenhouses, children playhouses and gazebos, this dimension may be reduced to five feet.

(c) Above 40 feet—With Fire Department Approval Only.

(d) With water and sewer service only.

(e) Where fire proof walls are used, no side yard is required.

History

The history line the source prints at the end of the section.

(Ord. No. 2016-11, 6-20-2016; Ord. No. 2018-12, 4-2-2018; Amd. of 10-7-2024(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:coffee-county/zoning/2.6@2024-10-07-ab4e66395c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Coffee County Zoning Ordinance, 2.6. Chapter 5 Section 35 Supplemental | Georgia Commons