Coffee County · Zoning Ordinance
Appendix D - LAND DEVELOPMENT CODE / Chapter 4 - DEVELOPMENT STANDARDS
4-11. Installation of Improvements.
About this text
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
4-11.1 The developer or developer's engineer/surveyor shall notify the County of the commencements, suspension, or resumption of work at least one day prior to the commencement, suspension or resumption of such work. This requirement shall not apply to work suspended due to adverse weather conditions. In the event that the developer or developer's engineer/surveyor fails
to comply with this requirement, the County is hereby authorized to take whatever steps may be necessary to insure that work performed complies with the approved engineering plans and specifications, the standards as set forth in this Code, and other applicable ordinance of Coffee County.
4-11.2 Actual construction of all improvements required by this Code shall be inspected by a competent inspector, approved by the County, and employed by and under the directions of the developer's engineer/surveyor and shall be performed in accordance with this Code. Said inspections shall be adequate in the opinion of the County to assure that all work complies with the approved engineering plans and specifications and this Code. See chapter 10, section 10-23(7).