a. The yard must be a minimum of five acres with a maximum slope of five percent.

b. The yard shall be located no closer than 300 feet to a residential zoning district or closer than 100 feet to a commercial district boundary line.

c. The property on which the collection activity is taking place shall be surrounded by a fence, wall or vegetative screening at least six feet in height. Such fence or wall shall be of similar composition, construction, and color throughout and shall be constructed without openings except for one entrance and one exit. The entrance and exit shall be equipped with unpierced gates which shall be closed and securely locked outside of business hours. In no case shall the fence be less than a height necessary to screen effectively all storage and other operations from view.

d. The yard is to be located no closer than 300 feet from the right-of-way of any arterial roadway.

e. Junked or wrecked vehicles shall not be stacked higher than any screening required by subsection c above. Under no circumstances shall vehicles be stacked higher than 14 feet.

f. All sides of each individual stockpile areas shall be accessible by fire lanes. Fire lanes shall be a minimum of one and one-half times the height of the pile, but in no case shall the fire lane be less than 20 feet wide.

g. The total site that may be covered with debris storage areas shall not exceed 60 percent of the site.

i. The base area on which the stockpiles are located, and the access aisles between the stock piles, must be constructed of either a concrete surface, asphalt surface, or other clean all weather stabilized surface that is acceptable to the County.

j. Every recycling, scrap, waste and salvage/junkyard operation authorized under this section, shall establish a cash security fund, bond or provide the County with an irrevocable letter of credit based on the schedule below, to secure the cost of removing of all accumulated debris and materials from the site if it has been determined by the County Commission, following a duly noticed public hearing, that the recycling, scrap, waste or salvage/junkyard operation has been abandoned or operations have ceased for a period in excess of six months or the permit has been revoked for any reason. The provisions of this paragraph shall not apply to any recycling, scrap, waste or salvage/ junkyard operation operated by any unit of local government within the County.

Yard Size Required Security 10 acres to 15 acres $75,000.00 More than 15 acres to 20 acres $125,000.00 More than 20 acres to 30 acres $175,000.00

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:coffee-county/zoning/5-43@2024-10-07-07d59e8241

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Coffee County Zoning Ordinance, 5-43. Salvage Yard, Junk Yard, Scrap, Waste, Land Clearing and Yard Trash | Georgia Commons