Skip to content
Georgia Commons
Menu

Coffee County · Zoning Ordinance

Appendix D - LAND DEVELOPMENT CODE / Chapter 5 - SUPPLEMENTAL STANDARDS

5-51. Surface Mining.

About this text

  • As published by Municode, current through 2024-10-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Surface mining is permitted in agricultural zoning district with the following conditions:

1. A surface mining permit issued by the Georgia Department of Natural Resources is required prior to any surface mining.

2. A 25-foot minimum buffer between the affected area and property line and/ or 50-foot minimum buffer if affected area is adjacent to a public road or occupied structures is required.

3. No buildings shall be built or placed within 100 feet of any adjoining property line.

History

The history line the source prints at the end of the section.

(Ord. No. 2016-11, 6-20-2016; Ord. of 11-6-2023)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:coffee-county/zoning/5-51@2024-10-07-cfd8f9749e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Coffee County Zoning Ordinance, 5-51. Surface Mining | Georgia Commons