Coffee County · Zoning Ordinance
Appendix D - LAND DEVELOPMENT CODE / Chapter 7 - BUILDING AND CONSTRUCTION STANDARDS FOR ROADS, STREETS AND PUBLIC UTILITIES
7-15. Street Construction Standards and Specifications.
About this text
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for street construction shall conform to the latest edition of the Georgia Department of Transportation Standard Specifications - Construction of Transportation Systems including all amendments.
a. Erosion and Sedimentation Control: All BMP devices and practices shall be installed, maintained, and/or performed in accordance with the Manual for Erosion and Sediment Control in Georgia, current edition.
b. Clearing and Grubbing: Before grading is started, the entire right-of-way area shall be first cleared and grubbed of all trees, stumps, roots, brush, debris and other objectionable materials per GDOT Clearing and Grubbing Specifications. Combustible material generated from clearing and grubbing operations may be burned only when authorized and permitted by the Coffee County Fire Chief.
c. Rough Grading: Conduct street earthwork construction in accordance with Georgia DOT Specification Sections 205 - Roadway Excavation and 208 - Embankments.
i. For purposes of these Regulations, the maximum density of soil material shall be determined by ASTM D 698 (Standard Proctor) test procedures.
d. Final Grading and Subgrade Preparation:
i. Perform sub grade construction in accordance with Georgia DOT Specification Section 209 - Subgrade Construction.
ii. The developer shall provide quality control testing during earthwork and subgrade construction as necessary to assure the entire earthwork, including all fill layers and subgrades, meet the minimum requirements of these Regulations. The minimum quality control testing to be provided consists of the following:
a. Moisture - density relationship curve for each type soil encountered.
b. One in-place density test (ASTM D 1556 or other recognized method) per 1,200 square yards or fraction thereof of subgrade or base to be paved.
c. One in-place density test (ASTM D1556 or other recognized method) per 1,000 cubic yards or fraction thereof of fill placed.
iii. Earthwork which falls below specified minimum quality control limits shall be removed, reconstructed and retested until compliance with specified requirements is achieved.
iv. After completing street earthwork operations and before beginning street base construction, the Developer shall file a copy of the quality control test results demonstrating compliance with these requirements with the County. At any time during the construction process, representatives of the County may request to review and the Developer shall provide quality control test results.
e. Post-Construction Stabilization of Disturbed Areas: When earthwork and paving are complete, the Developer shall seed with permanent grassing and stabilize all disturbed areas including roadway shoulders which are not covered by paving or other improvements. It shall be the Developer's responsibility to maintain grassed areas by watering, fertilizing, weeding, mowing, trimming, regrading and replanting as required to establish a smooth, acceptable stand of grass free of eroded or bare areas. Grassed areas will be considered acceptable when a viable stand of permanent grass covers at least 90 percent of the total area with no bare spots exceeding one square foot and the ground surface is fully stabilized against erosion. Grassing operations shall meet the technical requirements of Georgia DOT Specification Section 700 - Grassing for Planting Zone 4.
f. Base and Pavement Quality Control Testing Required:
i. Base construction which falls below specified minimum quality control limits as defined in GDOT's Standard Specifications for Construction of Transportation Systems shall be removed and reconstructed or mitigated if allowed by and in accordance with GDOT Specifications. Corrected areas shall be retested until compliance is achieved. The minimum quality control testing to be provided consists of the following:
a. Moisture-density relationship curve for each base material used on project.
b. For soil cement base, conduct mix design to determine Portland cement content (percent of dry weight of the soil) to achieve a minimum compressive strength of 300 psi at seven days when testing in accordance with ASTM D 1632 and D 1633.
c. One in-place density test (ASTM D 1556 or other method acceptable to the County per 1,200 square yards or fraction thereof of base.
d. One thickness measurement normal to base surface per 1,200 square yards or fraction thereof of base.
e. One surface tolerance measurement using a 15 foot straight edge per 250 square yards or fraction thereof of base.
f. One asphalt extraction (ASTM D 2172) and aggregate gradation analysis (ASTM C
136) per 2,400 square yards or fraction thereof of surface course and per 2,400 square yards or fraction thereof of binder course (if any). Obtain samples for extraction and gradation tests in accordance with ASTM D 979. 7) One density and compacted thickness measurement per 1,200 square yards or fraction thereof of each course placed. Density determined to be made in accordance with ASTM D 1188. Remove not less than three-inch diameter nor larger than 12-inch square test specimens. Repair test specimen holes with concrete.
g. Asphalt paving is subject to visual and straight edge inspection during and after construction operations until final acceptance. Inspect the base, intermediate, and surface course surfaces with the straight edge to detect irregularities. Pavements with irregularities that exceed one-fourth of an inch over ten feet are subject to rejection.
ii. Base construction which falls below specified minimum quality control limits shall be removed and replaced or remediated in accordance with GDOT specifications.
iii. After completing construction, the Developer shall file a copy of the quality control test results demonstrating compliance with these Regulations with the County. At any time during the construction process, representatives of the County may request to review and the Developer shall provide quality control test results.
g. Use of Non-specified Base or Paving Materials or Systems: In the event the Developer desires to utilize base or paving materials or systems not included in these Regulations, the Developer shall provide an engineering study prepared by a Georgia registered professional engineer comparing the proposed material or system to the appropriate system which is included in these Regulations. The engineering study will include a pavement structural design based on the AASHTO "Guide for Design of Pavement Structures" and suggested specifications for the materials and construction of the proposed system. The County will treat the Developer's request through the appeals process described elsewhere in this Code.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.