All authorized public utilities must be installed by a Georgia Licensed Underground Utility Contractor who must meet minimum bonding and insurance requirements as determined by the County. A note to this effect shall be shown on the construction plans. a. Placement of Utilities. i. All authorized public and private underground or overhead utilities shall be located within an easement designated for such use. Private underground utilities such as lawn sprinkler systems, septic tanks and drain fields, exterior lighting systems, and heating and cooling piping are not permitted within public street rights-of-way or adjacent easements reserved for other public utilities. ii. Underground utilities crossing public roads and right-of-way shall be installed with a minimum 42 inches of cover at all locations, including the bottom of ditches. Crossing utility mains shall not be installed within ten feet of a cross drainage structure and shall provide a minimum of 24 inches of clearance when crossing any longitudinal drainage structures. Utility service laterals shall be installed with a minimum of 24 inches of cover. iii. Utility crossings installed concurrently with roadway construction or at unpaved roadways shall be installed by open trench. Trench compaction shall be performed according to DOT specification to prevent settlement of the roadway. The locations of utility crossings at unpaved roadways shall be identified with a permanent sign posted at the right-of-way line indicating a buried utility crossing. iv. Utility installations that require crossing an existing paved roadway shall be performed by directional bore or other trenchless method. Cutting of paved roadways is not allowed. Utility mains four inches and smaller are not required to be cased. Utility mains larger than four inches shall be cased for a distance extending ten feet beyond the edges of pavement. v. As-built drawings illustrating the location, depth, size, materials, and any other appurtenances installed by the developer shall be submitted to the County upon completion of construction activities.