a. The subdivider shall provide adequate stormwater drainage in accordance with these regulations. The subdivider/developer shall also provide for adequate drainage for springs or other ground water drainage. b. The drainage system for a subdivision, commercial or industrial development shall be designed in accordance with sound engineering principles and procedures such that all developable parcels included in the subdivision plat are positively drained without negative impacts on neighboring parcels. c. The drainage system shall be designed to accommodate drainage from adjacent lands which naturally drain to or through the lands being subdivided. The drainage system shall be designed to not affect the natural drainage onto adjacent lands (no net increase in pre-development flows from the entire drainage basin). d. Drainage facilities that are designed to handle flowing water (i.e. culverts, weirs, etc.) shall be hydraulically designed to function when subjected to the maximum flow rate that can be expected to occur no more often than once in 25 years. e. Drainage facilities that are designed to handle water accumulations (e.g. retention ponds with no overflow provisions) shall be designed to accommodate the maximum water level that can be expected to occur no more often than once in every 100 years. Necessary drainage facilities including, but not limited to, culverts, rights-of-way, and easements, shall be dedicated to the Coffee County, at no expense to the County, and at the option of the County. Areas required for maintenance shall be cleared of all vegetation which would interfere with the maintenance of the facility.