7-5. Right-of-Way Requirements.
About this text
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. Minimum Right-of-Way and Pavement Widths:
i. The minimum widths for public rights-of-way or private street ingress/egress easements and pavements shall be as shown in "Table of Minimum Right-of-Way and Lane Widths." See Standard Drawings for detailed dimensions.
ii. Minimum widths of right-of-way and lanes shall be as shown in the "Table of Right-of-Way and Lane Widths."
Table 7-5.1: Minimum Right-of-Way and Lane Widths Street Category Minimum R-O-W Lane Widths* Minor Arterial Ditch section 100 ft. 12 ft.
C&G section 100 ft. 12 ft.
Collector Street Ditch section 80 ft. 12 ft. standard;
C&G section 80 ft. 12 ft. standard;
Rural Local Road Residential/Subdivision 60 ft. 12 ft.
Residential/Subdivision (C&G) 50 ft. 11 ft.* Commercial/Industrial/Other 60 ft. 12 ft. standard;
Cul-de-sac Commercial/Industrial/Other 75 ft. radius 65 ft. radius Residential 50 ft. radius 40 ft. radius Table 7-5.1: Minimum Right-of-Way and Lane Widths Street Category Minimum R-O-W Lane Widths* Notes:
*Lane widths include only pavement width. Example: 2 lanes @ 11 ft. with 2 ft. C&G would be 26 ft. back of curb to back of curb.
Lane widths on collector streets and other local (non-subdivision) streets will be based on design speed and traffic volumes
Number of lanes will be determined based on traffic volumes, except for subdivision streets which will be typically two lanes only.
Typical section details are show in Standard Drawings.
Should the required cut and fill slopes of the roadway extend beyond the minimum width, additional right-of-way shall be provided such that all cut and fill slopes are located within the dedicated right-of-way
Additional right-of-way may be required at intersections or other locations fronting the property where turning lanes, storage lanes, medians, re-alignments or other traffic safety improvements are required by the County or the State of Georgia.
Circumstances where additional R O W may be necessary:
On any existing street abutting a proposed development, one-half of the required width of right-of-way shall be dedicated, at no cost to the County, as measured from the centerline of the roadway along the entire property frontage. Right-of-way widths for existing streets shall be based on the current classification as determined by the County.
See chapter 10.