It is the responsibility of the Engineering Director Chief Building Inspector, or his/her designees to review the TPP to ascertain compliance with the provisions of this Article before a land-disturbance or soil erosion and sediment control permit will be issued. It is the responsibility of the Engineering Director Chief Building Inspector, or his/her designees to conduct a final inspection for compliance with this section before a certificate of occupancy will be granted. The Engineering Director Chief Building Inspector, or his/her designees have the authority to revoke, suspend, or void any land-disturbance permit or soil erosion and sediment control permit, stop all work on-site or any portion thereof, or withhold a certificate of occupancy when there has been a violation of any of the provisions of this Article.