--- title: College Park Zoning Ordinance, 8.5. Tree Protection Plan (TPP) Required collection: local-codes id: local-code:college-park/zoning/8.5 cite_as: College Park, Ga., Zoning Ordinance ยง 8.5 canonical_url: https://georgiacommons.org/code/local/college-park/zoning/8.5 md_url: https://georgiacommons.org/code/local/college-park/zoning/8.5.md text_url: https://georgiacommons.org/code/local/college-park/zoning/8.5/text source_url: https://library.municode.com/ga/college_park date: 2026-11-11 status: active jurisdiction: city:college-park jurisdiction_name: College Park place_fips: "1317776" corpus_version: local-codes-college-park-e76ef9e027eb publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/college-park/zoning/~appendix-a/~article-8.md previous: https://georgiacommons.org/code/local/college-park/zoning/8.4.md next: https://georgiacommons.org/code/local/college-park/zoning/8.6.md index: https://georgiacommons.org/code/local/college-park.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:college-park/zoning/8.5@2026-11-11-ed924440fa --- # College Park Zoning Ordinance, 8.5. Tree Protection Plan (TPP) Required > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING 3.46 / Article 8 - TREE PRESERVATION A tree protection plan (TPP) must be submitted to the Engineering Director Chief Building Inspector upon application for a land-disturbance permit. The TPP shall be combined with a preliminary plat, construction plans and/or site plans whenever possible. The TPP must be prepared by one (1) or more of the following professional, registered in the State of Georgia: registered landscape architect, urban forester, arborist, land surveyor, or engineer. The TPP must include: 1. The location of all trees with a trunk diameter of eight (8) inches DBH and larger and all dogwoods, redbuds, and magnolias with a trunk diameter of four (4) inches DBH and larger. For sites over ten (10) acres in size, representative sample areas proposed by the owner's licensed engineers may be used to determine tree density. The sample areas shall be representative of the average total tree coverage of the site. When city staff questions the sample's fair representation of average total tree coverage, the city manager after consultation with the city's engineers shall determine the sample areas to be used. 2. The species, location, DBH, and Critical Root Zone (CRZ) of all existing trees and specimen trees which will be retained to fulfill density requirements. Five (5) or more trees whose CRZ combine into one (1) tree protection area may be outlined as a group, with their size and species listed in a summary table. 3. The species, location and DBH of all trees proposed to be removed. The Engineering Director may require additional information including, but not limited to, a certified arborist's appraisal of the trees viability and anticipated life span. A specimen tree may be removed if it is shown that at least one (1) of the following conditions are met: a. The location of the tree prevents the opening of necessary traffic lanes. b. The location of the tree prevents access to the property, and that no alternative access exists. c. The tree is dead, diseased, or dying to the point that repair or restoration is not practical, or the disease may be transmitted to other trees, as determined by a certified arborist, the City Planner, or his/her designee, or Georgia Forestry Commission. d. The construction of utility lines necessary for the project cannot be installed via directional boring. i. The boundaries of all required buffer areas. ii. The boundaries of all landscaped areas. iii. The boundaries of all proposed buildings. iv. The boundaries of all other impervious surfaces. v. The location, depth and height of all utilities. 4. Upon submission of the TPP to the Engineering Director, a preliminary review will be made by the Engineering Director, or his/her designee. The TPP will either be approved, denied, or returned to the applicant with recommended changes, which must be made prior to the issuance of a land-disturbance permit or soil erosion and sediment control permit.