All new streets may be required to have curb and gutter built in accordance with county and DOT standards and specifications for: (1) Storm water management (limited rightof-way precludes ditches) (2) Stabilization of pavement edge (3) Ten feet on each side of drainage inlets (4) Intersections (5) Corners (6) Tight radii and that the planning commission has the authority to require curb and gutter with justification.