Colquitt County · Zoning Ordinance
Appendix B - SUBDIVISION REGULATIONS / Article VI - DEDICATION AND RESERVATION
Section 6.03. Utility easement.
About this text
- As published by Municode, current through 2025-02-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Utility easements for electric and telephone service lines, sewage lines, water lines, or other such utilities located along rear lot lines or side lot lines or passing through a lot shall be at least 20 feet wide and ten feet on each lot. No structure shall be built on such easement.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.