The Planning Commission shall review and approve an architectural storm water drainage plan for all classes of construction and property development prior to permits being issued by the building inspector. This plan must show retention of surface waters, controlled release into the Colquitt storm water drainage system, and diversion of any existing drainage pattern that may affect adjoining properties. Watershed into the drainage system cannot exceed predevelopment flow rates. The developer must bear the costs of controlling their storm water. Whenever possible, water will be channeled into underground storm sewers.